View Single Post
  #6  
Old 01-22-2013, 01:43 AM
PaperCutter PaperCutter is online now
LawnSite Bronze Member
 
Join Date: Sep 2006
Location: Northern VA
Posts: 1,444
Sounds reasonable. What I've done in several cases where we've done a patio right up to deck posts is a base moulding w/ mitered 2x6 trim and a 2x4 trim capital moulding against the beam. Lets us have a bigger gap between the post and the pavement to allow for movement, and it looks more finished than a straight post shwanking through the patio.
Reply With Quote
 
Page generated in 0.03272 seconds with 7 queries