View Single Post
  #9  
Old 01-24-2013, 11:32 AM
CMland CMland is offline
LawnSite Member
 
Join Date: Dec 2012
Posts: 49
I was going to cut driveway out to make room for base in front of wall. They want to redo driveway soon. Like I said I have worked on wall systems before so I explained to the homeowner what goes under and around the wall to make it last. They want a wall that will last and realize all this.

I realize this is a very small wall. With that said, I am looking for help on how to make it fit into this setting.

I have done a lot of driveway edge- pavers, brick, cobblestone and know how to install correctly. Although I am tagging this as "first job on my own" do not think I am planning on building anything the wrong way or shortcutting, and the homeowner is on the same page that whatever goes in will be built to last
Reply With Quote
 
Page generated in 0.03352 seconds with 7 queries