Quote:
Originally Posted by 1idejim
There should be no excuse that a facility the size of UT lack a damage prevention dept.
No work should be sched. without a utility callout and clearance. Same as a one call in public domains.
When not providing locates, infrastructure as-builts and surveys should be performed, maps drawn and logged.
The dept. would also provide inspections.
Contractors should be required to submit pics of their work with each billing.
If everyone works together a more productive experience will be had by all.
Posted via Mobile Device
|
My neighbirs wife is high up at UT in the building, construction dept at UT...I'll ask her the question...i gotta go take a look on campus, they have got some impressive rainwater recycling there on campus...
I can tell y'all why the construction guys keep hitting stuff...they are too busy watchen the girls...surprised anything gets done down there.