If its long and not necessarily wide (like 10') we could really move, stage pallets along the side with the skid steer.drive up the base and sprinkle the sand or load barrels. Two guys feeding and staging, 1 laying, i don't see why you couldnt do 600sf in a 8 hr day. Maybe even 800. That pattern should move pretty quick. Not as fast as a 1 size paver but much faster than the new random designs