Thread: screeding base
View Single Post
  #16  
Old 02-27-2013, 09:46 PM
DLCO DLCO is offline
LawnSite Member
 
Join Date: Feb 2013
Location: Ontario
Posts: 14
hmm "screed" is a new term to me.

I usually set pipes low for crush height, tamp (repeat these steps if the crush depth is a lot), then I set my pipes to my final height and use screenings as my final base.

If i'm not using pipes then I am leveling by hand. I am fantasic with the rake, but I think no matter how good you are it will not get you perfect heights or slopes, and has a big potential for dips in your interlock which obviously will lead to water pooling
Reply With Quote
 
Page generated in 0.03905 seconds with 7 queries