Quote:
Originally Posted by DLCO
1/4" per foot seems like a large ammount of slope... how large is your patio area going to be? I tend to slope 1" per 10 feet (which on a level would be so the bubble is just a little over the line)
|
That is hardly enough slope. At minimum 1%, ideal would be 2% grade.