Thread: screeding base
View Single Post
  #19  
Old 03-03-2013, 10:03 PM
jbailey52's Avatar
jbailey52 jbailey52 is offline
LawnSite Bronze Member
 
Join Date: Dec 2004
Location: Horticulture
Posts: 1,053
I agree with string levels. The only times my guys will even set up the laser, is when they are setting grades and elevations for level walls, or steps where they can scribe the lines. For slopes, they always use a string.
Reply With Quote
 
Page generated in 0.03842 seconds with 7 queries