Thread: lake staircase
View Single Post
Old 03-16-2013, 03:20 PM
Murphy's Law Murphy's Law is offline
LawnSite Member
Join Date: Dec 2010
Location: NH
Posts: 161
How do you handle putting in geotextile under those steps. Do you put layers in level spanning 3 or 4 steps or do you dig out at a slope and run fabric in longer lengths? Did that make sense?

I always thought fabric should be installed essentially "level" but with steps like these it doesn't make sense because you will be digging out sometimes 12" or 18".
Reply With Quote
Page generated in 0.03470 seconds with 8 queries