View Single Post
  #29  
Old 04-07-2013, 07:27 PM
weeze's Avatar
weeze weeze is offline
LawnSite Fanatic
 
Join Date: Apr 2011
Location: weezertonfieldville, AL
Posts: 5,400
there really is no difference either way guys. labor and materials seperate is or should be equal to the flat rate of per yard if figured correctly for each job. it doesn't have to be the same flat rate for every job. it can change based on what materials are being used, how many people working, and so forth.
__________________
Reply With Quote
 
Page generated in 0.03448 seconds with 7 queries