View Single Post
  #3  
Old 05-05-2013, 10:22 AM
wssolutions wssolutions is offline
LawnSite Member
 
Join Date: Mar 2012
Location: NE Ohio
Posts: 33
ZD326 Production

At one location, two 1 acre rectangles exist. The first has one obstruction and takes 17 minutes, 3 1/2 Ac per Hour. The other has a small building and some equipment and it requires 20 minutes, 3 Ac per Hour. At another location, 2.25 acres broken into 7 areas require 1 1/2 hours, 1 1/2 Ac per Hour. Grass clippings are not collected at either site. But if the ground is wet it is stuck and there goes the production.
Reply With Quote
 
Page generated in 0.03406 seconds with 7 queries