View Single Post
  #18  
Old 05-24-2013, 11:37 AM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,405
Interlocking pavement is a great choice it's a lot easier to redo then poured concrete that will sink
My point about the excavator is that I make a good dollar doing repair work why turn it down when the work is there. Instead of telling everybody it's going to end up Costing more you could assess the job knowing there is a good base and actually do the repair work and does not have to cost three times as much to redo.
Posted via Mobile Device
Reply With Quote
 
Page generated in 0.04349 seconds with 7 queries