View Single Post
  #15  
Old 06-23-2013, 08:37 AM
RWI RWI is offline
Banned
 
Join Date: May 2013
Location: GA
Posts: 125
Quote:
Originally Posted by longislandlawn View Post
I was out bided by the most expensive and biggest company in my area on a bed design and mulch job. Are these bigger companies getting very desperate in this economy, and bidding really really low. I bided 2,500 for a leaf removal , 30 yards of mulch , pruning , shaping, bed edging, cutting of low lying branches and building a few new beds. I am not sure how this guy went any lower , than me , this guy had like 20 guys working on it, a bob cat on site, 2 huge dump trucks. I am smaller and have less overhead and 2, 500 was even low to me.
Judging by your English and spelling even with spell check, he probably had a better sales pitch.
Reply With Quote
 
Page generated in 0.04000 seconds with 7 queries