Thread: Screed advice
View Single Post
  #14  
Old 07-18-2013, 10:32 PM
G_Dubs G_Dubs is offline
LawnSite Member
 
Join Date: Aug 2008
Posts: 39
its freestanding surrounded by turf, so if pitching to one side is easier and faster, that's what i'll do. 1" over 25ft, or 2"?

the place is opening on august 2nd, and the jobsite is already a circus.

We've also got a pretty good sized planting (about 120 shrubs, 10 big trees, tons of perennials, a few pockets of sod, and about 20,000 feet of soil prep/hydroseed) to squeeze in around where all the other subs are working, so i want the patio to be the least problematic area, logistically speaking.
Reply With Quote
 
Page generated in 0.04938 seconds with 7 queries