View Single Post
  #11  
Old 07-28-2013, 10:56 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
i do 25-88g jobs all day long.

nothing different on a 890g job just 10x the payroll, supplies,

everything is math. production time planting a tree with just an excavator vs excavator + skid steer etc.

the project will be done in stages, i will find out about it this month.

I assure you i can execute any project from 25g up.

numbers. projections. actual cost. variance. evaluate, adjust.

just to prove your point wrong, my first job was 10k and I never looked back. i bill 6 figures in august.
Reply With Quote
 
Page generated in 0.03803 seconds with 7 queries