View Single Post
  #9  
Old 07-30-2013, 02:10 PM
RigglePLC's Avatar
RigglePLC RigglePLC is online now
LawnSite Fanatic
 
Join Date: Jul 2006
Location: Grand Rapids MI
Posts: 9,165
Time is very tight. Go with Lesco 28-0-11; fast release is Ok in this situation. It should be green in two weeks. Meanwhile water heavily, take the weeds out and 3 times per week mow a bit shorter...reel mower with sharp blades; collect clipings. Treat it like a baseball field or golf course fairway. Naturally keep it very well-irrigated to stimulate maximum growth and green. Reduce the water about 3 days before the event so that the soil is not soft--but becomes firm enough for foot traffic. High heels are not good on soft soil.

Experiment with liquid chelated iron on your own lawn--if you like the greenish black type of color. Apply to his lawn abut 4 days in advance--quick--but does not last long.
Reply With Quote
 
Page generated in 0.03573 seconds with 7 queries