Yes, usually 3 riders, one to pan, one to laydown and one to finish, sometimes 4 if the slab is large and the temps are hot.

we mix and match depending on the job, some days we use a 48" walk behind with a pan, and a 60" rider to burn it out.

on the upper decks, we used 2 36" walk behinds and one 60" rider. on the restaurant we only used 2 walk behinds and 3 guys crawling pipes.

on slabs on grade we try to pan with a 8' rider to help flatten it, but upper decks cannot support the load of a large rider.