View Single Post
  #2  
Old 11-02-2013, 09:30 PM
clipfert clipfert is offline
LawnSite Member
 
Join Date: Feb 2002
Location: Eastern PA
Posts: 186
Your pitch should be 1/4" per foot. Your excavation should mirror your final elevation in regards to pitch. Your excavation depth should be a minimum 9 3/8" if you are using a 2 3/8" paver. Here's how it adds up: 2 3/8" paver + 1" Concrete sand setting bed + a minimum 6" modified stone base. I say minimum above because you may have a deeper excavation depending on soil type which would make your modified stone base deeper.
Reply With Quote
 
Page generated in 0.04606 seconds with 7 queries