View Single Post
Old 11-03-2013, 05:16 PM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,504
Use a transit for accuracy, know your finish grade at point a and b. Set up 12" higher on your grade stick and stop digging when the proper depth is achieved. Level with a rake and compact. Proper base pitch is not always achieved and can be an issue if clay is what you're digging in.
Reply With Quote
Page generated in 0.03731 seconds with 8 queries