View Single Post
  #4  
Old 05-20-2000, 03:06 AM
southside southside is offline
LawnSite Senior Member
 
Join Date: Jan 2000
Location: Brisbane Australia
Posts: 790
20min/100 ft? Sounds a bit slow.We use a 3<br>wheel edger to edge 10 miles at one subdivision we do,and I get it all done in <br>6 hours,with moderate growth. Is a 3 wheel <br>edger necessary on this job? You can cut a<br>pretty decent edge with a line trimmer and <br>work at a fast walking/slow running pace.<br>580ft should only take about 1/2 hr maximum.<p>Karl<br>
Reply With Quote
 
Page generated in 0.03591 seconds with 7 queries