Thread: Gettin It right
View Single Post
  #1  
Old 03-15-2005, 03:53 PM
Bobcat s250 NY's Avatar
Bobcat s250 NY Bobcat s250 NY is offline
Banned
 
Join Date: Jan 2005
Location: texas
Posts: 98
Gettin It right

How you guys doing? This year i am looking into using Pave Edge Paver restraints on some of my installs. The method that i used to use was placing all of the outside pavers in cement Then nothching a board and screeding the middle. Any variation in elevation was able to me made up with concrete under the pavers on the outside. Since there is no way to do this with the pave edges, What do you guys do to get the base perfectly level to put these edges down. For example i have a driveway that is 10x 20 with a garage floor at the top and a cement sidewalk to meet at the bottom. Usually i would Dig it out get the level close And wrap a brick with a string and stretch it to the sidewalk running directly over the edge. If my bricks were touching the string i was perfect, now without anyway to make up for places that are not level, what should i do? I guess what i am asking is how to level the base for use with pave edge.. Seems hard to think about how to do it , it may just have to be tried and see what happens.
Thank you very much in advance for your time and answers.
Reply With Quote
 
Page generated in 0.04047 seconds with 7 queries