Quote:
Originally Posted by topgunlandscaping
Mark, this a good size job in the sense that you will have to take up the old limestone and then take another 3 or 4 inchs of dirt out , so you can get a nice flat surface, and then you put down a weed barrier, and then a base. Then you put in the lime stone. There is going to be alot of removal and the big dumpsters are not really ment for that kind of removal, but to each is there own. Let me know what happens
if you are laying down screenings then I dont see the weed fabric being a big deal, limestone screenings will pack down almost as hard as cement

just as a fyi you cannot load a roll off full to the top with gravel, they will tripple the cost of the container as a overweight fee

I tore out our driveway to save a grand and loaded up a 40 yard rolloff with all the concrete, it was packed almost to the top, they charged me $650 to haul it off