Voltage Drop Compendium

Ok Everyone.... Lets see them....

I would like to build a compendium of VOLTAGE DROP FORMULAS.

So, get out your handy slide rule, or look up the info in your favourite manufactueres tech manuals, or call your local cable rep, and lets post up as many different Voltage Drop Formulas as we can find.

No Bickering, lets keep it clean!

Then once we have a few different versions here, I will purchase a brand new, calibrated, TRUE RMS Meter from either Fluke or Greenlee and set about to test each method, reporting back my findings.

This should be fun!
__________________
James Solecki
INTEGRA ~ Bespoke Lighting Systems ®
JSLDesign Inc.


www.integralighting.com

www.facebook.com/INTEGRA.Lighting

Affiliations: IESNA, IALD, IDA, AOLP, LO, MBA
Reply With Quote
  #2  
Old 12-11-2007, 07:37 AM
Chris J's Avatar
Chris J Chris J is offline
LawnSite Silver Member
 
Join Date: Sep 2006
Location: North Florida
Posts: 2,012
I just use the simple formula to get me very close. I always use the meter for final calculations and settings.
Length x watts divided by cable constant, then multiply by 2.
This generally puts me right where I need to be, but the meter has the final say.
__________________
Chris J, CLO (Chief Luminary Officer)
Johnson Landscape Lighting, Inc.
Member AOLP, CLVLT #0638
FL Lic#ES12000428
, GA Lic#LVG105244
www.JohnsonLightingInc.com
Reply With Quote
  #3  
Old 12-11-2007, 07:52 AM
INTEGRA Bespoke Lighting's Avatar
INTEGRA Bespoke Lighting INTEGRA Bespoke Lighting is offline
LawnSite Gold Member
 
Join Date: Jun 2007
Location: Muskoka, Ontario, Canada
Posts: 3,865
Ahh I should have been more specific here! Can you please also include the "Cable Constant" figure you are using. Lets keep things simple and go with 12/2 as our base line cable.

Thanks.
__________________
James Solecki
INTEGRA ~ Bespoke Lighting Systems ®
JSLDesign Inc.


www.integralighting.com

www.facebook.com/INTEGRA.Lighting

Affiliations: IESNA, IALD, IDA, AOLP, LO, MBA
Reply With Quote
  #4  
Old 12-11-2007, 08:11 AM
pete scalia pete scalia is offline
LawnSite Senior Member
 
Join Date: Sep 2007
Location: Long Island, New York
Posts: 960
If you must rely upon referencing a mathematical formula every time you build a low voltage lighting circuit then you'd better find another line of work cause you'll never make it in this business. If you have experience and a voltage and amperage meter then you will never ever need to even know any voltage drop formulas.
Reply With Quote
  #5  
Old 12-11-2007, 09:40 AM
Pro-Scapes's Avatar
Pro-Scapes Pro-Scapes is offline
LawnSite Platinum Member
 
Join Date: Apr 2005
Location: South Mississippi
Posts: 4,224
its rare i find myself determining voltage drop before a job. I can usually come REAL close by adding up the run what tap I need to be on then without a formula I check a lamp underload for the proper voltage and adjust if needed. Often times I find wire runs need to be routed another route or otherwise changed in lenght. There is no one formula that will compensate for real world testing and adjustment of each and every system

Its also a rarity I need a tap over 14v too. I think I recall 1 time needed a trans that would go over 15v and that was on a retro/reinstall where client declined all new

If I need to determine vd before a job I use chris's method

As for planning on paper we use a sketch or site plans... determine wattages and ALWAYS assume more will be added. Additional lights are an easy upsell if they do not need to purchase a new trans. I do run calculations but I have no practice of determining VD before a Job. The cast wire calculator or unique wizard will do all of this for you

Last edited by Pro-Scapes; 12-11-2007 at 09:46 AM.
Reply With Quote
  #6  
Old 12-11-2007, 09:34 AM
irrig8r irrig8r is offline
LawnSite Platinum Member
 
Join Date: Dec 2004
Location: Silicon Valley, CA
Posts: 4,543
Pete, please explain to me how you plan a job on paper with your multimeter. It simply ain't gonna happen my friend.
__________________
Landscaper. Irrigator. Illuminator. Music lover. Coffee drinker.
Reply With Quote
  #7  
Old 12-11-2007, 10:23 PM
pete scalia pete scalia is offline
LawnSite Senior Member
 
Join Date: Sep 2007
Location: Long Island, New York
Posts: 960
Quote:
Originally Posted by irrig8r View Post
Pete, please explain to me how you plan a job on paper with your multimeter. It simply ain't gonna happen my friend.
Plan a job on paper? why do you need to do that. I determine all my cable and fixture configurations in the field.
Reply With Quote
  #8  
Old 12-11-2007, 09:55 AM
JoeyD's Avatar
JoeyD JoeyD is offline
LawnSite Silver Member
 
Join Date: Aug 2007
Location: Escondido, CA
Posts: 2,965
AMPS x DISTANCE x 2 x .00162 (12/2 RESISTANCE)

No need to run a test, I am telling you that this is the best and most accurate VD method. Trust me when I say we have run all the tests you plan to run and this method always is most accurate. Like Pete said a Volt Meter is the absolute best way to calculate and then to echo Billy, my Wireng Wizard does all of the thinking for you.

But have at it, MAKE SURE YOU POST YOUR METHOD OF CHOICE JAMES!!!!! and let us know the criteria becuase for fun I will run the same tests. So what is our citeria

200ft 12/2 run w/ 100watts? testing to the first point of connection?? Hub wireing or Daisy Chain, or T?
Reply With Quote
  #9  
Old 12-11-2007, 09:57 AM
irrig8r irrig8r is offline
LawnSite Platinum Member
 
Join Date: Dec 2004
Location: Silicon Valley, CA
Posts: 4,543
James,
Nate Mullen's formula doesn't use a cable constant... as I showed in my example the other day, it's like this:

(Distance x 2) x Amperage x Resistance


At first I thought that they might have a vested interest in raising voltage drop numbers to justify their multi-tap system.

Then I checked it with the formula Vista uses. It is the same as Nightscaping's formula except that the wire length is multiplied by 2 (by some notion that the electricity is flowing both directions on the wire) and it gets results similar to but not quite as high as the Unique formula..


(Distance x 2) x VA/ cable constant


(using the same cable constants as the NS formula)

I've tested Vista's formula against my meter readings, and it comes the closest and is good enough to plan jobs with.

BTW, I was talking with the Vista rep yesterday at my distributor about it. He said they sell multi-tap systems that go up to 22 V too (probably just to maintain market share) but he'd never run into a job where more than 15 V was needed.

He said that in the long run the client pays more for wasted electricity and that as the cost of power goes up (who on earth thinks it won't?) it will outweigh the initial materials savings.

On the other hand, we both agreed that LEDs will change everything.
__________________
Landscaper. Irrigator. Illuminator. Music lover. Coffee drinker.
Reply With Quote
  #10  
Old 12-11-2007, 10:05 AM
JoeyD's Avatar
JoeyD JoeyD is offline
LawnSite Silver Member
 
Join Date: Aug 2007
Location: Escondido, CA
Posts: 2,965
Quote:
Originally Posted by irrig8r View Post
James,
Nate Mullen's formula doesn't use a cable constant... as I showed in my example the other day, it's like this:

(Distance x 2) x Amperage x Resistance


At first I thought that they might have a vested interest in raising voltage drop numbers to justify their multi-tap system.

Then I checked it with the formula Vista uses. It is the same as Nightscaping's formula except that the wire length is multiplied by 2 (by some notion that the electricity is flowing both directions on the wire) and it gets results similar to but not quite as high as the Unique formula..


(Distance x 2) x VA/ cable constant


(using the same cable constants as the NS formula)

I've tested Vista's formula against my meter readings, and it comes the closest and is good enough to plan jobs with.

BTW, I was talking with the Vista rep yesterday at my distributor about it. He said they sell multi-tap systems that go up to 22 V too (probably just to maintain market share) but he'd never run into a job where more than 15 V was needed.

He said that in the long run the client pays more for wasted electricity and that as the cost of power goes up (who on earth thinks it won't?) it will outweigh the initial materials savings.

On the other hand, we both agreed that LEDs will change everything.
Your Vista rep needs to do a bit more research. why would having taps 16-22v cause wasted electricity.makes no sense?

And yeah Vista makes a TF that is NON UL 1838 it is listed UL 506 and goes to 22v to COMPETE WITH UNIQUE!! obviously.

We did not manipulate the formula to increase VD, unlike what most think we are not slimeballs looking to make an extra buck. Anyone who comes to our classes for the last 10 years knows we lead the industry in education and we always inform people based off of FACT and we prove this with volt meters and amp probes. And no we do not calibrate our own meters.

unbelieveable. Never been on a job that needed more than 15V HAHAHAHAHAH

Must not of ever pulled a 12/2 run more than 200 ft with 80 watts on it???? Sounds like the rep has never been on a big job. Oh wait let me guess, he uses 10/2 for those long runs.......sounds real cost effective.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 11:25 AM.

Page generated in 0.15319 seconds with 8 queries