|
|
|
#1
|
|||
|
|||
|
Questions about grading???
I am meeting with a home builder this Monday and he wants to discuss grading and levelling for a new home division in my area. I haven't worked doing grading on new homes and was wondering the steps to accomplish this. If anybody had the time to explain it to me it would be muchly appreciated. From excavation of basement to rough grade and final grade. I have about 1000 hours on my machine and feel very confident but am just unsure as to what they might expect. Thanks.
|
|
#2
|
||||
|
||||
|
Quote:
|
|
#3
|
|||
|
|||
|
As far as rough grading and final grading goes how specific should the builder be. What would you consider a rough grade and what is considered a final grade.
|
|
#4
|
||||
|
||||
|
Quote:
The rough grade is basicly just smooth so that works can drive and work around the house without issue. It has to be a postive grade away from the house of course. Final grade is basically ready to landscape. Make sure that you clarify who is providing topsoil if not enough was generated during excavation. Also not mentioned earlier is clarify if they want the entire foundation hoe packed along with utility trenches. Also clarify if you are preparing surfaces for concrete placement and what that will entail IE type of material to be used, compaction and to what degree of accuracy. |
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|













Hybrid Mode
