Quote:
Originally Posted by scholzee
Looks great, if that is a transit use some of the profit for a laser it will save you tons a time on the jobs to come.
true i really do want to pick up a laser level , But arent laser levels only good if the whole are is to be set at 1 grade and level ? i was thinking of it and this yard had so many diffrent grades and i needed to get water away from the house. let me know because i really would like to pick up the laser level
Reply With Quote
  #12  
Old 08-05-2005, 06:28 AM
surfisher211's Avatar
surfisher211 surfisher211 is offline
LawnSite Member
 
Join Date: Jan 2005
Location: Jersey
Posts: 142
Quote:
Originally Posted by A Simple Cut
are those double holland's, what is the brand of pavers you used?
they are made by anchor concrete and its there london cobble brand
Reply With Quote
  #13  
Old 08-05-2005, 07:20 AM
scholzee scholzee is offline
LawnSite Member
 
Join Date: Jun 2005
Location: NY
Posts: 138
For the laser you have the reciever end on a blank or white painted grade stick. You can mark a line with a pencil and label it at what grade you want. You slide the reciever to the line you want grade at then lock it there. Lift the stick up or dowm until it beeps and the bottom of the stick is where the grade should be. i just did a septic system and had marks for bottom of pit, 1 ft stone, 3ft sand, 1 ft stone, etc. So while digging and at bottom of pit reciever is at that line, pits done slide reciever to 1ft stone mark. stone is being dumped iin pit and as i touch bottom of stick to stone and its starts to beep I know that is the grade to be at. then slide up to sand mark, start dumping sand and when bottom of stick is on sand and beeps I am at that grade. For pipe if you want 1/4 " per foot slope say over 12 ' that is 3 " . Bottom of stick on high end get grade with beep, mark a line from receiver 3 " down slide recievr there. Go to end of pipe and move stick up or down to get beep, bottom of stick is where you want pipe at 3" lower from other end. Long winded reply hope you get the idea, it is easier than it sounds.
Reply With Quote
  #14  
Old 08-06-2005, 02:34 PM
Dirty Water's Avatar
Dirty Water Dirty Water is offline
LawnSite Fanatic
 
Join Date: May 2005
Location: Redmond, WA
Posts: 6,802
Back when I worked in the concrete industry I was building a retaining wall footing and our laser crapped out on me.

Let me tell you, going back to a transit for a day after using a laser is the worst thing ever
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 03:35 PM.

Page generated in 0.07542 seconds with 9 queries