Register free!

The Green Industry's Resource Center


 
 
Thread Tools   Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 06-01-2006, 08:49 AM
hdtvluvr hdtvluvr is offline
LawnSite Senior Member
 
Join Date: Apr 2006
Location: Memphis, TN
Posts: 440
Time to dry

It looks like I will be getting my driveway sealed in August. This is the hottest time of the year. How long would it take the sealer to dry? My asphalt drive leads to a concrete pad outside the garage. I don't want to track the sealer onto the concrete.

Thanks
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 03:04 AM.

Page generated in 0.07254 seconds with 8 queries