I just want t o be sure I am not taking advantage of a client. My profit seems a bit high on this job.

Total materials cost was 8600, labor hrs were 116. I bid the job an based on an avg of 200 per light, 20-k total. I used good quality lights, copper Nightscape, a few Cast lights, and F/X bronze and copper. Two F/X transformers900-600 and tied into an existing F/X and an existing Nightscaping transformers.

The only thing out of the ordinary is we did not have to do much digging as there were already trenches open. Lots of tree work though, 36 of the 100 were up in trees.

Things are going well, I just don't want any bad Karma. I also want to get the going rate too. The client will pay whatever they trust me completely. I gave them ball park of 20-K and got a 10-K deposit. It was kind of a work in progress as they added and changed things along the way.

A little help from the specialists please.
Reply With Quote
  #2  
Old 10-09-2006, 09:25 PM
NightScenes's Avatar
NightScenes NightScenes is offline
LawnSite Silver Member
 
Join Date: Dec 2005
Location: Kingsland, Texas
Posts: 2,192
Hey there AZ. I hope they move this response as well as the post. You are charging a very fare price for the project in my opinion. Are you counting the time spent designing? How about trips to and from? Did you advertise to get the job?
__________________

Paul R Gosselin, Sr., CLVLT(#0632)
NightScenes Corporation
President, AOLP
www.night-scenes.com
www.facebook.com/NightScenes
Reply With Quote
  #3  
Old 10-09-2006, 09:38 PM
Az Gardener Az Gardener is offline
LawnSite Gold Member
 
Join Date: Sep 2005
Location: Phoenix, Az
Posts: 3,893
They are a regular maintenance client. As far as the design went it was all field placement. I wired in a few samples that I already had to see what effects/style they liked, had a night meeting made notes and flagged. Next day I lined out my guy. Went back two weeks later had another night meeting to review. They wanted to add a few more here and there and adjust a couple and that was it. For now any way. My time is included in the 116 MH. Thanks for the response.
Reply With Quote
  #4  
Old 10-09-2006, 10:20 PM
NightScenes's Avatar
NightScenes NightScenes is offline
LawnSite Silver Member
 
Join Date: Dec 2005
Location: Kingsland, Texas
Posts: 2,192
For a project of 100 fixtures you should clear at least $10k. You are using very high end material and just because you lucked out and were able to use open ditches, doesn't mean you should make less money. Sometimes you get lucky and make a few extra bucks. Believe me, you will run up against several jobs that will require more work than you thought you would have and you will loose all of that money back. It all washes out after awhile. Sometimes you have a higher profit margin and sometimes it's less.
__________________

Paul R Gosselin, Sr., CLVLT(#0632)
NightScenes Corporation
President, AOLP
www.night-scenes.com
www.facebook.com/NightScenes
Reply With Quote
  #5  
Old 10-10-2006, 08:42 AM
extlights's Avatar
extlights extlights is offline
LawnSite Senior Member
 
Join Date: Jun 2006
Location: Madison, WI
Posts: 439
To me, it seems a little low. If it were a standard installation (not that 100 fixtures is standard)......I think you're right on the money. I would probably be a bit higher due to so much tree work. 36 trees is A LOT of work, so something like this we're usually going to be in the 24-26K range.

Sounds like a good project though. Good luck with it!
__________________
Dave
Reply With Quote
  #6  
Old 10-10-2006, 09:28 PM
Pro-Scapes's Avatar
Pro-Scapes Pro-Scapes is offline
LawnSite Platinum Member
 
Join Date: Apr 2005
Location: South Mississippi
Posts: 4,224
your not price gouging

never mind not going to reply. I think this thread should be removed. Your price is a bit low for dangerous tree work tho. Contractor costs on a project has no place in a public forum

Last edited by Pro-Scapes; 10-10-2006 at 09:30 PM. Reason: thread should be removed
Reply With Quote
  #7  
Old 10-13-2006, 12:33 AM
Az Gardener Az Gardener is offline
LawnSite Gold Member
 
Join Date: Sep 2005
Location: Phoenix, Az
Posts: 3,893
Quote:
Originally Posted by Pro-Scapes
never mind not going to reply. I think this thread should be removed. Your price is a bit low for dangerous tree work tho. Contractor costs on a project has no place in a public forum
Sorry, you are probably right about the contractor pricing. The tree work was not high up, we did it all off a 6 ft. ladder.
Reply With Quote
  #8  
Old 10-13-2006, 07:32 AM
stumpjumper stumpjumper is offline
LawnSite Member
 
Join Date: Feb 2006
Location: prague,oklahoma
Posts: 184
Price checks on aisle 1,2,3, and 4, do you know how price anything?
Reply With Quote
  #9  
Old 10-21-2006, 04:01 PM
drumbo's Avatar
drumbo drumbo is offline
LawnSite Senior Member
 
Join Date: Feb 2006
Location: Hannibal, MO
Posts: 339
Quote:
Originally Posted by stumpjumper
Price checks on aisle 1,2,3, and 4, do you know how price anything?
Were you insulting him while writing a sentence with obvious errors?
Now, that's funny! LOL
__________________
"In the beginning of a change, the patriot is a scarce man, and brave, and hated and scorned. When his cause succeeds, the timid join him for then it costs nothing to be a patriot."-- Mark Twain
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 07:38 PM.

Page generated in 0.09810 seconds with 9 queries