|
#1
|
||||
|
||||
|
fert. program for 122,000 sf.
total irrgation,
1-lime 2-pre-m/fert 1-fert. broadleaf weed control 4- fert. applications i come up with $305.00 per application lime app. calls for no soil test but going to do a ph anyway. i was seeded in may and it is going to be seeded again soon. what do you think? ant |
|
#2
|
|||
|
|||
|
Do I read this correctly, 7 total fert applications? How many real visits and trips over the area?
__________________
Harold |
|
#3
|
||||
|
||||
|
lime-feb
crab/fert-mar.1/2 rate crab/fert april 3/4 to full rate broadleaf/fert.1/4-1/2 lb n. may (momentum liquid) organic base 1/2-3/4 n. june summer app. 1/4-1/2 n july late summer 1 lb. n.sept winter l 1b. n oct-nov total of 4-5.5 lbs. n per m. per season ant |
|
#4
|
|||
|
|||
|
Me thinks the program is a little wacky and I'm assuming (dangerously) that these are someone elses specs.
Be that as it may, you have the same equip I do. I'd add up the material and the hours to apply. I'd want to get at least $80 to $120 an hour for application time, including drive and load plus material cost.
__________________
Harold |
|
#5
|
|||
|
|||
|
We round our acres down to 44m/sf. For an acre we would charge $132 for Fert. I would calculate your measurement to be 2.8 acres.
Therefore: Fert= $370 CGP= $492 W/C= $492 LIME= $162 This is how I would breakdown your applications. Hope this helps. Kris |
|
#6
|
|||
|
|||
|
I have an account that is 120,000sfand i charge $340.00 per app.
Tony |
|
#7
|
||||
|
||||
|
tony" how many steps?
harold:what seems wacky with this spec? |
|
#8
|
|||
|
|||
|
Ant, Four
|
|
#9
|
|||
|
|||
|
ant - wacky fert spec
Ant - Too much N early and late, spacing too close together. Is this your spec? Umpteen trips over the site. If somebody has money to throw, send it up a couple of counties.
__________________
Harold |
![]() |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|











Linear Mode
