I made my own wire spooler. I welded rebar into double A frames, and I use a concrete stake for the spool holder I can remove when I need to change spools. Thing works freakin awesome and will never get pulled over.
__________________


Tim Ryan
Lite4 Outdoor Lighting
www.lite-4.com
Reply With Quote
  #22  
Old 01-06-2008, 03:39 AM
ChampionLS's Avatar
ChampionLS ChampionLS is offline
LawnSite Bronze Member
 
Join Date: Mar 2005
Location: Highland Park, New Jersey
Posts: 1,066
Bah! too much work.

We use have these Wire Spool Caddy's. They can handle a 500' spool and fold up nicely to fit your vehicle. They are better than the other vertical spool reels, which allow your cable to tangle.
Attached Images
 
Reply With Quote
  #23  
Old 01-06-2008, 09:31 AM
NightScenes's Avatar
NightScenes NightScenes is offline
LawnSite Silver Member
 
Join Date: Dec 2005
Location: Kingsland, Texas
Posts: 2,196
I had one made that will hold 4-500' reels. The problem is that it takes up a lot of space but it more than makes up for it in time saved pulling home runs. Grab 4 and go.
__________________

Paul R Gosselin, Sr., CLVLT(#0632)
NightScenes Corporation
Director, AOLP
www.night-scenes.com
www.facebook.com/NightScenes
Reply With Quote
  #24  
Old 01-06-2008, 10:08 AM
Mike M Mike M is offline
LawnSite Bronze Member
 
Join Date: Feb 2006
Location: South Carolina
Posts: 1,816
I have tried your tape measure idea for making leads and doing T's but it slows you down with all the trips back and forth.

Thanks Billy, everyone. Holy crap, I have to stop and think about wire spools and pulling runs. I've been running back and forth, worse yet, I'm so cheap I've been bringing the spool with me while burrying it to make sure I use every inch. That's so stupid. It's why I was thinking of pre-measuring with the tape.

By the way, I noticed the Cast tin-coat 10 gauge I was using yesterday was easier to work with than the generic 12 I have.

If anyone remembers the landscaping olympics idea, I think you guys should have a lighting installer competition at aolp. The equivilent of lumberjack competions or tractor pulling, etc. Who can lay multiple runs the fastest, a splicing obsticle course, who can mount the highest tree light, and a 26.6 mile trenching marathon (haha).
Reply With Quote
  #25  
Old 01-06-2008, 12:42 PM
Pro-Scapes's Avatar
Pro-Scapes Pro-Scapes is offline
LawnSite Platinum Member
 
Join Date: Apr 2005
Location: South Mississippi
Posts: 4,224
wow mike that sounds like a ton of extra work. Pull your homeruns from a dispenser of some sort from the trans. since you have not had a ton of installs yet you can pull 1 at a time until your comfy with it. Then you will learn the advantages of routing so you only need a single artery line then viens breaking off from that.

Not only does it speed up installation but its safer for your wires as well.

If we are uplighting a home we usually dig our trench right up against the foundation first then pull the lines to the hub locations. If you have zero twists and everything is the same lenght you should be able to bury cleanly in a bundle.

fir single or double runs in your soft sand just make a slit altho often you will find 2 guys really help with that as the sand likes to fall in
Reply With Quote
  #26  
Old 01-06-2008, 01:40 PM
ChampionLS's Avatar
ChampionLS ChampionLS is offline
LawnSite Bronze Member
 
Join Date: Mar 2005
Location: Highland Park, New Jersey
Posts: 1,066
Another method for measuring wire runs and not having to use your tape measure would be to purchase a roll counter. The same one they use when you buy rope, or wire products. The one I have is made by Olympic. Google it.
Reply With Quote
  #27  
Old 01-06-2008, 05:53 PM
Mike M Mike M is offline
LawnSite Bronze Member
 
Join Date: Feb 2006
Location: South Carolina
Posts: 1,816
Then you will learn the advantages of routing so you only need a single artery line then viens breaking off from that.

Okay, let's say I have 100 feet for a main artery, with a few splits off of that before the end. Should I pull and cut all the the wires, place them near the trench, straighten/untwist wires and tie them together, then place them in the trench, and then place the veins in the trench after that? It's how I've been doing it, except I wasn't pulling off at the transformer, plus I was placing the wire in the trench as I went along.

When pulling wires around sturcture and at curves or angles, how do you guide the wire along the run before placing it in the trench?
Reply With Quote
  #28  
Old 01-07-2008, 12:51 AM
INTEGRA Bespoke Lighting's Avatar
INTEGRA Bespoke Lighting INTEGRA Bespoke Lighting is offline
LawnSite Platinum Member
 
Join Date: Jun 2007
Location: Muskoka, Ontario, Canada
Posts: 4,016
Quote:
Originally Posted by Mike M View Post
Then you will learn the advantages of routing so you only need a single artery line then viens breaking off from that.

Okay, let's say I have 100 feet for a main artery, with a few splits off of that before the end. Should I pull and cut all the the wires, place them near the trench, straighten/untwist wires and tie them together, then place them in the trench, and then place the veins in the trench after that? It's how I've been doing it, except I wasn't pulling off at the transformer, plus I was placing the wire in the trench as I went along.

When pulling wires around sturcture and at curves or angles, how do you guide the wire along the run before placing it in the trench?
My advice to you at this point: Stop thinking so much about it and just do it.
K.I.S.S.
I flag the job, then hang the transformers, then dig all the ditches, then pull all the wire, then install the fixtures, then make the connections, check voltage at the fixtures, then bury it all up. When making fast progress with a grunt on the pick and shovel, I will have him bury all the wire except for the connections.

By doing the installation in complete stages I have found it to go much faster.
__________________
James Solecki
INTEGRA ~ Bespoke Lighting Systems ®
JSLDesign Inc.


www.integralighting.com

www.facebook.com/INTEGRA.Lighting

Affiliations: IESNA, IALD, IDA, AOLP, LO, MBA
Reply With Quote
  #29  
Old 01-07-2008, 06:15 AM
Mike M Mike M is offline
LawnSite Bronze Member
 
Join Date: Feb 2006
Location: South Carolina
Posts: 1,816
Thanks for the patience and great advice guys;

I'm very much into details. I've been working on getting the pattern/routine nailed so I can focus better on the job.

Just be glad I didn't ask for images!

Mike M.
Reply With Quote
  #30  
Old 01-07-2008, 09:09 AM
Pro-Scapes's Avatar
Pro-Scapes Pro-Scapes is offline
LawnSite Platinum Member
 
Join Date: Apr 2005
Location: South Mississippi
Posts: 4,224
I do it similar to how james does it.

I usually place fixtures while I have the laborer start digging the mainsI then place hub boxes and fixtures and set the wires where I want them to go in the which hubs. He will bury em all and leave the wires hanging out of the hub for me.

We did a tranch for the mains and a slit for any smaller things like leads or a single main.

for pulling around curves...pull your main to the destination then walk back laying it where you want it pulling any needed slack from the spool side being carful not to yank your line away from your hub.

If you have sharp corners like you often will with brick homes I like thoes hose handler rollers you stick in the ground... i get em at lowes or wal mart. little roller on a plastic stake. They will protect your wire and the clients home. Simply step on em or slam em in the ground then yank em up when your done.

Rememeber to go extra deep around bed edges
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 05:04 PM.

Page generated in 0.10212 seconds with 10 queries