no mention of stairs but i was thinking 1 guy 2 days ie 20 man hrs.
Reply With Quote
  #12  
Old 09-15-2010, 10:01 PM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,397
Quote:
Originally Posted by kootoomootoo View Post
no mention of stairs but i was thinking 1 guy 2 days ie 20 man hrs.
What planet did you say you were from?
Reply With Quote
  #13  
Old 09-15-2010, 11:41 PM
Hardscaping Hardscaping is offline
LawnSite Senior Member
 
Join Date: Aug 2008
Location: southern ontario
Posts: 359
Quote:
Originally Posted by kootoomootoo View Post
no mention of stairs but i was thinking 1 guy 2 days ie 20 man hrs.
I agree, with my small skid steer. one guy two days, two guys one day 20 man hours. I would prefer 2 guys one day. I just did a 315 sq ft patio the a couple weeks ago there was 25 man hours into it without my skidsteer.
Reply With Quote
  #14  
Old 09-16-2010, 05:41 AM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,397
Quote:
Originally Posted by Hardscaping View Post
I agree, with my small skid steer. one guy two days, two guys one day 20 man hours. I would prefer 2 guys one day. I just did a 315 sq ft patio the a couple weeks ago there was 25 man hours into it without my skidsteer.
So basically what you are saying is one man does the job alone right, because one guy needs to be running the skid steer (which is the wrong tool to dig a patio btw especially in clay such as your area) and the other guy is hauling the fill out of there. So now you are alone doing this patio. Then with your mini skid steer you are going to fill the patio one bucket at a time, which is how much in your small skid? wheelbarrow and a half at most? Now lets assume that the granular stone is dumped in the front yard and the patio is out back, thats alot of time invested in driving back and forth with the skid (small skid that is) then what I want to know is who is doing the compacting while you are running back and forth, if its you then aint no one hauling granular and raking it while you are doing this. I don't have time to go on about it but in the real world that job is not feasible in twenty hours. I gotta get to work, have a nice day.
Reply With Quote
  #15  
Old 09-16-2010, 06:53 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,735
i didnt site here and cost this out.

But a 300 SF patio would takes us no less than 2 days. re-grading, seeding, cleaning the road, etc. 1 day for the excavating / base install. 1 day for the paver install, cut pavers, install poly sand. Plus probably 3 hrs for the grading / seeding. MAybe 1 hr for the cleaning of the street.

Not to mention the time for loading and mobilizing the tools and equipment. Unloading scraps at the yard, unloading left over pavers, etc., at the yard. Very important to account for such.

This veteran contractor whom is known for quality and detail knows it'll be no less than 2 1/2 days. And really, we all know there is no such thing as 1/2 day of work.




,
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #16  
Old 09-16-2010, 10:26 AM
wurkn with amish's Avatar
wurkn with amish wurkn with amish is offline
LawnSite Senior Member
 
Join Date: Apr 2006
Location: in the bathroom
Posts: 663
We would be at 3 days with 3 men. no 1/2 day charge by the time your done screwing around with the small stuff-- like DVS said
Also have 2 trucks on the job, a miniex, and possibly skid loader of some sorts, saws, compactor, and various other tools to get the job done.
__________________
nothing but a horse and buggy
Reply With Quote
  #17  
Old 09-16-2010, 02:40 PM
westernmdlawn westernmdlawn is offline
LawnSite Member
 
Join Date: Nov 2003
Location: Frostburg, Maryland
Posts: 98
I agree, realistically 3 days with 2 guys. Maybe a 3rd guy when you are laying pavers or cutting and sweeping joint sand depending, and cleaning up. Depends on how you operate of course, but there is no way to do all of that work in 20 man hours - not even close.

I would have a mini-excavator and my one ton dump truck there for sure, in addition to all the smaller tools.
Reply With Quote
  #18  
Old 09-16-2010, 11:35 PM
Hardscaping Hardscaping is offline
LawnSite Senior Member
 
Join Date: Aug 2008
Location: southern ontario
Posts: 359
You guys are ridiculous and saying that a 300 sq ft patio should take 3 days with 3 guys.

maybe if it was some intricate design then i could understand, but come on, 90 man hours to do a 300 sq ft patio. to dig and install base with two guys it should take no longer than 5 hours with a small skid steer. with a regular base of 8 inches, at 300 ft you only have 8 yards of material coming out and 8 going in. if you cannot move 16 yards of material with a small skid steer within five hours then you really need to get some training on how to use you machine.

Just yesturday i put 15 yards of topsoil into a backyard within an hour and half as well as spread by myself. So with two guys and a skid steer you cannot move that much within five hours and compact it, then you should rethink your labor.
Reply With Quote
  #19  
Old 09-16-2010, 11:47 PM
Hardscaping Hardscaping is offline
LawnSite Senior Member
 
Join Date: Aug 2008
Location: southern ontario
Posts: 359
Also i am one of the guys on every job that i do, so i guess that would make a difference.

I guess i can understand two laborers 35 man hours without me being one of the labor. that is understandable.
Reply With Quote
  #20  
Old 09-17-2010, 12:35 AM
steve5966's Avatar
steve5966 steve5966 is offline
LawnSite Member
 
Join Date: Aug 2007
Location: omaha nebraska
Posts: 210
Quote:
Originally Posted by Hardscaping View Post
You guys are ridiculous and saying that a 300 sq ft patio should take 3 days with 3 guys.

maybe if it was some intricate design then i could understand, but come on, 90 man hours to do a 300 sq ft patio. to dig and install base with two guys it should take no longer than 5 hours with a small skid steer. with a regular base of 8 inches, at 300 ft you only have 8 yards of material coming out and 8 going in. if you cannot move 16 yards of material with a small skid steer within five hours then you really need to get some training on how to use you machine.

Just yesturday i put 15 yards of topsoil into a backyard within an hour and half as well as spread by myself. So with two guys and a skid steer you cannot move that much within five hours and compact it, then you should rethink your labor.
300 square? A little over 2 days with 3 guys, no skid or mini-ex or pad to tear out. If your guys can't hand dig and haul a 300 square patio, you may need new guys. Machines tear up the yard, feet don't.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:51 AM.

Page generated in 0.10600 seconds with 9 queries