Aggregate over moist soil/clay

In the process of installing 2 inch thick concrete pavers...15x15, for a walkway. I'm using 4-6 inches of 3/4' processed gravel on top of a landscape fabric.

It rained heavy 3 days ago and I had 2-3 inches of standing water in my excavated area. I drained the water 2 days ago and today, in certain areas, the soil is still mushy. There's no free standing water however I can clump the soil in my hand like a snowball and throw it. It's mostly dirt however there appears to be some clay mixed in.

I plan on doing this job in 2 days...so the soil will have 4.5 full days to dry (temps around 50f, no rain in the forecast). If it's still wet like it is now, is it advisable to continue with the project? Is there anything I can do to accelerate the drying time? Any other recommendations?
Reply With Quote
  #2  
Old 11-11-2010, 08:16 AM
WGrnd21 WGrnd21 is offline
LawnSite Member
 
Join Date: Nov 2009
Location: NC
Posts: 73
throw some lime, or kitty litter on the soil and it will absorb the water and speed up drying time. I would not proceed with the job untill the soil has dried more.
Reply With Quote
  #3  
Old 11-11-2010, 11:21 AM
knineteen knineteen is offline
LawnSite Member
 
Join Date: Nov 2010
Location: Connecticut
Posts: 2
Quote:
Originally Posted by WGrnd21 View Post
throw some lime, or kitty litter on the soil and it will absorb the water and speed up drying time. I would not proceed with the job untill the soil has dried more.
Is there a certain technique I want to apply using litter? Throw it on, spread it, leave it for a day and sweep it up?

I started over excavating the wettest and squishiest areas and will use spare soil/gravel mix that I have available...but I can only do so much given the timeline.
Reply With Quote
  #4  
Old 11-11-2010, 04:50 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,757
better just hold off and wait till May and do it right....



,
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #5  
Old 11-11-2010, 08:36 PM
Tim R. Tim R. is offline
LawnSite Member
 
Join Date: Mar 2010
Location: Indianapolis
Posts: 88
If it's real bad, you will need to pull out the soggy soil. Instead of using landscape fabric I would advise a good woven geotextile fabric to ensure those clay fines won't work their way up into your base gravel.
Posted via Mobile Device
Reply With Quote
  #6  
Old 11-11-2010, 08:44 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,757
we just built a wall in clay soil territory.

It rained a week ago. And I'd guess that the soil still has 70% moisture from the rain. I really don't see it drying out till late spring at this point. Where as the soil on my land at home was dry 48 hrs later (0% clay content).
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #7  
Old 11-12-2010, 09:30 AM
sgallaher's Avatar
sgallaher sgallaher is offline
LawnSite Senior Member
 
Join Date: Jan 2002
Location: Middle TN
Posts: 265
You need to make sure that you dig out all that is necessary. You may have to use 10" OF 3/4" crush instead. A few extra dollars in stone is better than having to re-do the whole thing.
__________________
Steve Gallaher
Independent AMSOIL Dealer
World Class Lubricants
blog site

Reply With Quote
  #8  
Old 11-12-2010, 12:59 PM
JimLewis's Avatar
JimLewis JimLewis is online now
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,438
First of all, I feel your pain. I live in Oregon. We sort of have the monopoly on rain and clay soil. We're dealing with this very problem that you explain for a good 8 months out of the year. If we waited for it to dry out completely, we'd only be able to work maybe 3 or 4 months out of the year. Fortunately, it doesn't happen every time we do a job, even in the wet season. Usually, once we excavate down, the soil that is left is still pretty hard. So we're good to go. But we still end up having to deal with the very problem you describe several times throughout each year.

What we've learned to do is first to work in some larger aggregate gravel INTO the clay soil. So we'll bring in an inch or two of larger like 1" size gravel and lay it down on the clay. Then we start working it INTO the clay, either by hand with a tamper or with a plate compactor, if possible. Once we get the gravel pushed down into the clay, we add some more. Eventually, you get enough gravel worked into the clay below that it begins to drain and harden up. Once it hardens up, we add a layer of straight gravel on top of this clay/gravel mix. Once we get a good inch of gravel on TOP of the clay/gravel mix and it's not mushy anymore, THEN we proceed with our normal process, which is to install some of the woven geotextile fabric and then our 4" base of rock, compact, then sand, then pavers.

Another trick is to use tarps before and during the job. If we are doing a job and we know it's going to be really rainy before we start - we will go over a week or two before and install tarps over the whole area to keep it dry. This helps a lot. And same thing DURING the job. Whenever we leave the jobsite (if rain is in the forecast) we tarp up the whole area again to KEEP it dry.
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 05:31 AM.

Page generated in 0.09181 seconds with 9 queries