Register free!

The Green Industry's Resource Center



 
 
Thread Tools   Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 02-26-2011, 09:25 AM
mrusk mrusk is offline
LawnSite Gold Member
 
Join Date: May 2003
Location: northern jersey
Posts: 3,247
Working on a 41* slope...

We are designing a job where we need to build 48 stone steps into a hill leading down to a lake. This is a very steep, tight lot. The slope has a 41 percent slope.

My question is, will my pc150 be able to hold the slope? What I am going to do is get the machine facing up and down on the slope. All my stone and gravel will get dumped into the bucket of the excavator with my skid, and then ill run the excavator back up the hill. Will I have problems with the machine on such a steep slope?

Last edited by mrusk; 02-26-2011 at 09:30 AM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 03:19 AM.

Page generated in 0.13895 seconds with 8 queries