what do you think ?.......

I was asked to bid a job to remove 11,000 square ft x 6" of B gravel from a yard to prepare it for concrete.
With calculations i have done I come out with approx 16 to 20 tri axle load of material. The owner is saying he thinks 3 to 4 load should clean it up
Just approximate figuring am i way out with the loads count?
Reply With Quote
  #2  
Old 05-09-2011, 08:16 AM
Darryl G Darryl G is offline
LawnSite Fanatic
 
Join Date: May 2001
Posts: 7,957
I figured 18 loads based on 20 tons per truck and a weight of 1.75 tons per yard. So I'd say you're in the right ballpark.
Reply With Quote
  #3  
Old 05-09-2011, 06:30 PM
wanabe's Avatar
wanabe wanabe is offline
LawnSite Senior Member
 
Join Date: Jan 2004
Location: So. IL
Posts: 931
I come up with 16.5 loads(20 ton), but that does not count compacted rock, so I would be a little more.
Reply With Quote
  #4  
Old 05-09-2011, 07:26 PM
Kepple Services Kepple Services is offline
LawnSite Senior Member
 
Join Date: Mar 2006
Location: Orlando, FL
Posts: 361
The cutomers are rarely right...
__________________
Reply With Quote
  #5  
Old 05-09-2011, 07:27 PM
obie obie is offline
LawnSite Member
 
Join Date: Apr 2011
Location: Houston, Texas
Posts: 25
Hope this helps

Show your customer the math if you feel it might help. 11,000sqft by 6 inches is 5500 cubic feet. Divide 5500 by 27 is 203.7 cubic yards. If you think compaction is 5% add 10.2 cubic yards or 10% add 20.4 cubic yards. So maybe a total of 213.9 or 224.1 cubic yards. Do not know how you guys up north prep for concrete prehaps you can bid to leave some material on site and re-compact. Good luck-make money!
Reply With Quote
  #6  
Old 05-09-2011, 08:14 PM
hvy 1ton's Avatar
hvy 1ton hvy 1ton is offline
LawnSite Senior Member
 
Join Date: May 2009
Location: Lawrence KS
Posts: 556
If it is compacted to 95% it will weigh 10-15% more than the calculated volume. Swell will be ~20% from 95% to in the truck. Not up to running the numbers tonight.
__________________
Life summed up by refrigerator magnets:
HE WHO DIES WITH THE MOST TOYS WINS
OLD RANCHERS NEVER DIE,
THEY JUST QUIT HORSIN AROUND
Reply With Quote
  #7  
Old 05-09-2011, 08:18 PM
Darryl G Darryl G is offline
LawnSite Fanatic
 
Join Date: May 2001
Posts: 7,957
On second thought, I think your customer is right. You can do it in 3 or 4 loads. You just need one of these.
Attached Images
 
Reply With Quote
  #8  
Old 05-09-2011, 09:29 PM
Nelson M Martin's Avatar
Nelson M Martin Nelson M Martin is offline
LawnSite Member
 
Join Date: Sep 2007
Location: Ontario
Posts: 173
thanks guys, the info helps to confirm my estimation!!
I have not seen the job .. but will be stock piling the spoils and the customer says he will take care of trucking later
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 03:26 PM.

Page generated in 0.08984 seconds with 10 queries