Register free!
Search
 
     

Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 07-28-2012, 03:43 PM
Wicked Mower Wicked Mower is offline
LawnSite Member
 
Join Date: Jul 2012
Posts: 9
Lawn Renovation Job

I got a call from this woman that needs a lawn renovation basically. She doesn't know whether she wants seed or sod, so she wants quotes for both. The yard is about 7400 sq. ft., real patchy and weedy. So I'm thinking about actually giving her 3 quotes. One for sod, one for powerseeding, and one for tilling and power seeding. My only problem is I don't know how long it will take.

If I put down sod, I am thinking about 3-4 - 8 hour days, after tilling and laying the sod, and putting out the water timers, and so on.

Just overseeding/powerseeding, I know it will probably be about a day.

For tilling/powerseeding, after I clean up all the debris from tilling, I am thinking about 2.5 days.

I have thought about just marking up the product by 25 percent, then doubling my materials, but I would like to see where I would come out as far as time goes, and compare the two. Thanks in advance.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 01:01 PM.

Page generated in 0.07359 seconds with 8 queries