Register free!

The Green Industry's Resource Center



 
 
Thread Tools   Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-30-2012, 08:07 PM
capt bob capt bob is offline
LawnSite Member
 
Join Date: Aug 2012
Location: clearwater fl
Posts: 47
Big Job hopefully finishing up this weekend

This will be my second weekend at this 110,000 Sq ft Facility
I Cleaned the rear and Loading area 2 weekend ago 11,000 Sq Ft
Concrete and the Upper trim that was Fully involved with Black Algae
along with Awnings and Down spouts , Nothing would touch it but straight 12 %
Lift worked great and was a life saver , I am doing the front and both sides this weekend (labor day) yep plenty of labor , The Structural is not as involved as the Powdercoated hopefully can get by with a lighter solution really dont want to put any pressure to that stuff other than dialed off rinsing out of the lift.
Will have to try and get the Glass front done before afternoon to keep the Sun from drying the Chemicals on the Glass faced building, to date this is the biggest job i ever pulled off (hopefully) .
Attached Images
           
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 02:40 AM.

Page generated in 0.06468 seconds with 9 queries