|
#1
|
|||
|
|||
|
Big Job hopefully finishing up this weekend
This will be my second weekend at this 110,000 Sq ft Facility
I Cleaned the rear and Loading area 2 weekend ago 11,000 Sq Ft Concrete and the Upper trim that was Fully involved with Black Algae along with Awnings and Down spouts , Nothing would touch it but straight 12 % Lift worked great and was a life saver , I am doing the front and both sides this weekend (labor day) yep plenty of labor , The Structural is not as involved as the Powdercoated hopefully can get by with a lighter solution really dont want to put any pressure to that stuff other than dialed off rinsing out of the lift. Will have to try and get the Glass front done before afternoon to keep the Sun from drying the Chemicals on the Glass faced building, to date this is the biggest job i ever pulled off (hopefully) . |
| Bookmarks |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|












Threaded Mode