Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 11-09-2012, 07:27 AM
HBFOXJr HBFOXJr is offline
LawnSite Bronze Member
 
Join Date: Jul 2001
Location: Southern New Jersey
Posts: 1,700
job cost data

Quote:
Originally Posted by ddmcintosh1 View Post
The info I'm most worried about losing is all of the job cost info, ex. how long each job took vs. estimated time, etc. All billing info is already in QB because I invoice thru QB, but I don't do job costing thru QB right now, I only do job costing thru Qxpress. Thanks for your help.
I don't think that is possible to move job cost data. Once you do a job, or a job for a year, you know what to adjust for the future. That's what job costing is about, the future and knowing now if you met your goal or projection. Historically I don't see it as valuable, other than building your knowledge bank of productions costs and times for the future.

I kept QX active for about 8 months and then deleted the program. Saved the data base. I never used it.
__________________
Harold
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 06:30 PM.

Page generated in 0.32697 seconds with 9 queries