Register free!
Search
 
     

Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 12-09-2012, 02:03 PM
Wet_Boots's Avatar
Wet_Boots Wet_Boots is offline
LawnSite Fanatic
 
Join Date: Mar 2005
Location: metro NYC
Posts: 39,629
If the POC is by the curb you are stuck with some length of field wiring. Basement meters can mean less than ten feet of control cable leading from controller to valve manifold.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 02:32 AM.

Page generated in 0.87455 seconds with 9 queries