Prev Previous Post   Next Post Next
  #11  
Old 12-09-2012, 03:03 PM
Wet_Boots's Avatar
Wet_Boots Wet_Boots is offline
LawnSite Fanatic
 
Join Date: Mar 2005
Location: metro NYC
Posts: 44,786
If the POC is by the curb you are stuck with some length of field wiring. Basement meters can mean less than ten feet of control cable leading from controller to valve manifold.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Layout Style:




Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2016, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Grand View Media
All times are GMT -4. The time now is 12:03 AM.

Page generated in 1.01726 seconds with 10 queries