Register free!
Search
 
     

Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 01-31-2013, 07:33 PM
andyslawncare andyslawncare is offline
LawnSite Senior Member
 
Join Date: Jan 2008
Location: Palmetto, GA
Posts: 812
First pondless nearing completion-looking for criticism

I'm looking for some constructive criticism to further help me do this better.

I've tinkered here and there on this for around 10 months and as I get extra stone from jobs. I wanted a more formal look from thin stack flag, and I think my next demo project will be one with field stone. Its in my back yard and will hopefully look good enough when I'm done to get my foot into some jobs with a good build budget. I used thin stack flag, 1 piece of liner and 3 small concrete block walls that I veneered against. Used type s mortar behind each stone layer and in between rear 2/3 stone gaps. The basin is 3' deep all the way across the visible area and about 16'' wide; I used scrap corrugated pipe that I drilled holes into to fill the basin, then used 2 layers of chicken wire before decorating the top.

I still need to finish securing the top stones and maybe change a few areas. Also, the back still isn't finished because I've been trying to decide on how i'm going to have it start; currently about 1' deep x 1' wide x 2' long is the entrance area, where the hose is clamped to a 1.5'' pvc pipe with cap and adapter--the pipe has about 20 1/4'' holes drilled in it. I'm considering increasing the pump size or changing the spillway stone on the right side. I'm probably going to plant the dry areas this spring. Its plumbed for an auto fill valve and wired for lighting to my existing transformer.

You can see below the dog where I changed the design :/ I'll probably fix that sooner or later or hide with a plant before I take the selling photos--also considering going back to the original design by knocking out that area. I'm also going to replace the cap stone under the dog.

Did the whole thing with mostly recycled or left over materials from other jobs--I have maybe $150 in it.

Things I would have done differently:
1. Done a design and thought about it more before starting
2. allowed more room for the fall start area or used a preformed spilway.
3. not built it while drinking!

Questions:
1.should I score the undersides and possibly do something on top of the spillways to encourage a more dramatic drop, as the water is not so much leaking through the wall as it is going off the sides and under the spill stones which is why the wall shows wetness?
2. Am I close enough to an acceptable product to invest some more time and money to redo with a second feature or should I dress this up a bit and try to sell? I know if I had a bigger budget I would have been able to do a better job picking stones. I'm usually pretty good at flagstone veneering, as you can see between the 2 lower falls (level and tight gaps; same here http://www.dtelawncare.com/2012-07-2...op_640x480.jpg)...I just used what I had and didn't really put much money into it.

Thanks for your criticism!
Attached Images
 
__________________
Landscape management, design, and installation
Horticulturalist with Specialization in Landscape Management

25 years old 7 years in business ownership
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 08:21 AM.

Page generated in 0.06791 seconds with 9 queries