Register free!
Search
 
     

Click for Weather
Reply
 
Thread Tools Display Modes
  #1  
Old 02-28-2013, 12:46 AM
JimLewis's Avatar
JimLewis JimLewis is offline
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,512
How Would You Answer This Question From Customer?

This is time sensitive because my client is just about to make a decision and sign a contract with me or the other company and I need to reply pretty quickly.....

I have a customer who's done a pretty fair amount of work with us in the past. Recently we had given him a proposal for a pretty good size paver patio (Belgard Mega Arbel). He ended up getting a quote from another company for basically the same patio. But this other company has convinced him that they do base prep. better than their competitors. Instead of a base of compacted aggregate, they do it on a 4" base of concrete, reinforced with rebar.

I told him that if he was really sold on that method and that company, I didn't want to get in the way. But if he was still open to discussing the option of having us install the paver patio, the way that the manufacturer recommends and the ICPI recommends (compact aggregate base) then I'd love to look over the proposal one more time and discuss our proposal more in detail with him.

He said he is still open to discussing it with us, but wants to understand the advantages of doing the base our way vs. the other company's way. Here's exactly what he wrote to me:

"Thanks Jim. I'm interested to better understand the advantages of the compact gravel base rather than the concrete foundation reinforced with rebar. We want to make sure the surface is sound and we don't ever experience the cracking that currently exists with our patio." (Their current patio is just exposed aggregate concrete with major cracks)

Now I would normally just explain how compact aggregate, if done properly, is your most stable base. How the concrete, even with rebar, can still crack (especially in our climate) and that will probably lead to separation in the pavers above. But am I missing anything? What exactly would your reply be?
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon
Reply With Quote
  #2  
Old 02-28-2013, 07:04 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,817
Many contractors are venturing more and more into pouring slabs. Virtually guarantees no call backs.

The purpose of unit pavers is they float with the heaving in the winter, where as concrete does not, hence their cracked exposed aggregate.

The compacted aggregate base is the same method all highways and roads are built on. Whether asphalt or concrete - it's placed over compacted aggregate.
Posted via Mobile Device
Reply With Quote
  #3  
Old 02-28-2013, 07:26 AM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Gold Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 3,048
I also tell customers that a slab will trap water between the brick and the comcrete and lead to cracking brick since whatever seeps through the joint has nowhere to dissipate to
Posted via Mobile Device
Reply With Quote
  #4  
Old 02-28-2013, 07:55 AM
shovelracer shovelracer is offline
LawnSite Silver Member
 
Join Date: Sep 2004
Location: North Jersey
Posts: 2,009
There are benefits to each. Really by doing the poured base they are defeating the purpose of a paver installation and it's ease to repair and ability to handle ground change. The poured method would be better than a poor base installation, but a proper base installation would be the best result for the dollar. The poured base is a waste of money that is not needed if the base installation is handled correctly. If they are going to go as far as to pour why not just go stamped at that point and get the most value?

My official response would be that the pour is not needed when the base is installed properly, and by doing so is a waste of money. Sure it has benefits, but when the slab cracks or heaves the patio will be much more expensive to fix. We plan on installing to industry standards or beyond and we back it with our 5 year guarantee, but really if you ever have base issues please just let me know and I'll have it taken care of... Is the other company offering to jack hammer out and repour the concrete base if there is an issue down the road?
Reply With Quote
  #5  
Old 02-28-2013, 08:38 AM
ztman ztman is online now
LawnSite Senior Member
 
Join Date: May 2012
Location: mountain pa
Posts: 787
Shovel racers suggested reply:
My official response would be that the pour is not needed when the base is installed properly, and by doing so is a waste of money. Sure it has benefits, but when the slab cracks or heaves the patio will be much more expensive to fix. We plan on installing to industry standards or beyond and we back it with our 5 year guarantee, but really if you ever have base issues please just let me know and I'll have it taken care of... Is the other company offering to jack hammer out and repour the concrete base if there is an issue down the road?[/QUOTE]

I like shovel racer's suggested reply.
I assume there is a large price difference in the two quotes. Since this is your customer, any reason why you dont want to quote it both ways. If you are not experienced in installing concrete slabs, get a sub to quote it, and you can let your customer choose the install method he wants
Reply With Quote
  #6  
Old 02-28-2013, 10:20 AM
Dirt Boy's Avatar
Dirt Boy Dirt Boy is offline
LawnSite Senior Member
 
Join Date: Nov 2005
Location: Nebraska
Posts: 451
I assume there is a large price difference in the two quotes. Since this is your customer, any reason why you dont want to quote it both ways. If you are not experienced in installing concrete slabs, get a sub to quote it, and you can let your customer choose the install method he wants[/QUOTE]

By doing/saying this, aren't you kinda like saying "they're right"?
Just sounds to me like you're saying the other companies method is just as good as my way, and I really don't know what I'm doing.
Jim, if your convinced, and I know you are, that doing it your way is the best way, then stick to it, win or lose.
If you offer to put it on a slab, and you have someone else do the slab, or even if you do it yourself, you will always be wondering about it.
Industry standard ICPI methods are what they are for a reason.
I think there were some other good thoughts already suggested, i.e. drainage, etc.

Just my $.002 worth.
Reply With Quote
  #7  
Old 02-28-2013, 10:22 AM
JJfishes JJfishes is offline
LawnSite Member
 
Join Date: Mar 2005
Location: Rochester, New York
Posts: 14
I am wondering if they are pouring a slab then doing a sand base over the concrete. I have done overlays this way with no problems. Was a major savings over ripping out and redoing with aggregate base. The concrete we went over was in very good shape with minimal cracks and no heaving. I have never priced out a slab with sand base and wonder what the price difference would be. Seems like it could be a time saver, just wonder if it justifies the any cost difference. This would be the only way I would propose it in a frost environment.
Reply With Quote
  #8  
Old 02-28-2013, 10:30 AM
JimLewis's Avatar
JimLewis JimLewis is offline
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,512
Thank you all very much! I just sent off my reply to the customer. With the help of your guys' points and wording, I was able to articulate what I was wanting to say to him much better. I think we now have a really good shot at getting this job, whereas a few days ago it looked like we were almost out of the running and he was just about the sign with the other company.

I really appreciate the help, guys!
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon
Reply With Quote
  #9  
Old 02-28-2013, 06:31 PM
jbailey52's Avatar
jbailey52 jbailey52 is offline
LawnSite Bronze Member
 
Join Date: Dec 2004
Location: Horticulture
Posts: 1,052
Jim let us know how this turns out. We all know the right way to do this, but I wouldn't be surprised at all if the customer feels a concrete base is the best way...

All the suggestions are great. But I probably would have giggled and said, what would your patio look like now if pavers were Instaled on top of that?
Reply With Quote
  #10  
Old 03-08-2013, 01:34 PM
MatthewG's Avatar
MatthewG MatthewG is offline
LawnSite Member
 
Join Date: Jun 2009
Location: Slatington PA
Posts: 223
Looking forward to their response
__________________
www.pawinterservices.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 07:51 PM.

Page generated in 0.07240 seconds with 9 queries