Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
Hustler Oregon Cutting Systems Wright Billy Goat lawn mower parts mowpart.com Wise Sales
Gold Eagle JRCO, Inc. Turfco Toro Bobcat Mowers
Gold Eagle
Reply
 
Thread Tools Display Modes
  #21  
Old 03-02-2013, 05:32 PM
muddywater muddywater is offline
LawnSite Bronze Member
 
Join Date: Sep 2011
Posts: 1,813
What is the process for exposed aggregate?
Reply With Quote
  #22  
Old 03-02-2013, 06:10 PM
SVA_Concrete's Avatar
SVA_Concrete SVA_Concrete is offline
LawnSite Senior Member
 
Join Date: Oct 2010
Posts: 408
For starters the the concrete mix is a bit special, for example only pea gravel for brown exposed. Or only 78 stone for gray exposed 3/8 size stone.

Next you want to pour a bit stiff, 4 inch slump is ideal we will pour a 5" in the summer. Strike off the concrete as accurate as possible and only float enough to close the surface. Over floating will sink the stone/gravel and pull up too much cream.

Spray on control set, this delays the set of the top 1/4 inch or so of mortar, and wash with a pressure washer once the bottom has set enough

The key is uniformity of the mix, enough help to work the mud at the exact timing. And a good read on the setting of the concrete.
Posted via Mobile Device
Reply With Quote
  #23  
Old 03-02-2013, 11:24 PM
mxridernorth mxridernorth is online now
LawnSite Member
 
Join Date: Apr 2008
Location: North Saanich
Posts: 228
Nice work! I can't imagine the stress on a big poor, after all the hard prep work, and then knowing you have such a short window and so many parameters and only one shot to get it right.
Reply With Quote
  #24  
Old 03-03-2013, 09:32 AM
SVA_Concrete's Avatar
SVA_Concrete SVA_Concrete is offline
LawnSite Senior Member
 
Join Date: Oct 2010
Posts: 408
The key is pre planning, and the ability to adapt. I dont get stressed much anymore. Just do what you know.

Keep in mind, when you pour a 100 yard pours, the first truck is batched roughly 1.5 hour earlier than the last. The same goes for the finishing procedures.
Posted via Mobile Device
Reply With Quote
  #25  
Old 05-18-2013, 08:29 PM
SVA_Concrete's Avatar
SVA_Concrete SVA_Concrete is offline
LawnSite Senior Member
 
Join Date: Oct 2010
Posts: 408
A few more photos
Attached Images
        
__________________
.
.
If you do what you've always done, you'll get what you've always got.
Reply With Quote
  #26  
Old 05-18-2013, 10:56 PM
alldayrj's Avatar
alldayrj alldayrj is online now
LawnSite Bronze Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 1,431
Nice stuff sva. I love pouring without forms, makes me feel like a cowboy. What's the circle for?
__________________
RJ All Day
Gehl 5640
Mustang 940
2003 International 4300 dump
1989 International S1900 dump
2003 Ford F250 6.0 diesel
www.rjfalcone.com
Reply With Quote
  #27  
Old 05-19-2013, 01:55 AM
hvy 1ton's Avatar
hvy 1ton hvy 1ton is online now
LawnSite Senior Member
 
Join Date: May 2009
Location: Lawrence KS
Posts: 529
All the sidewalk on the front half of my parent's house is exposed river rock. Looks awesome, but it's hard on bare feet, yes i'm part hillbilly, and sucks to shovel snow off it. At least they didn't use it for the pool deck.
__________________
Life summed up by refrigerator magnets:
HE WHO DIES WITH THE MOST TOYS WINS
OLD RANCHERS NEVER DIE,
THEY JUST QUIT HORSIN AROUND
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 01:13 AM.

Page generated in 0.08206 seconds with 10 queries