Boulder Walls

Looking to see a range of what everyone is charging per foot on boulder walls. Have to bid one and am curious to see what the prices are with lawn site members. I know everyone can say they charge .... per sq foot of a retaining wall but it seems boulder walls haven't been as discussed on here. Interesting to see how the responses on prices.

The wall I'm looking to gain insight on to help bid is a 4 feet tall wall for 60 feet and then the remained of the wall is 2 feet high for 50 feet. Have to tear out an existing boulder wall that was done with too small of rock. Won't be able to use much of the existing rock as its to small. Plan to hire the hauling of the rock in to location to save on time and wear on my stuff.
__________________
www.wdsmlawncare.com
Reply With Quote
  #2  
Old 06-09-2013, 12:32 AM
Drakeslayer Drakeslayer is offline
LawnSite Member
 
Join Date: Apr 2013
Posts: 132
A lot depends on site conditions and access. Will you need to bring in soil or will you be hauling your cut out? You will need to bring in about 60 ton of boulders. I have been anywhere from $20-45 a SF. I will always figure materials and labor on a per job basis.
Reply With Quote
  #3  
Old 06-10-2013, 12:44 AM
Wiedmann's Avatar
Wiedmann Wiedmann is offline
LawnSite Member
 
Join Date: Apr 2011
Location: Prole, IA
Posts: 128
I will have to bring in some soil to fill with. Biggest thing to me is time it will take to do this and the hassle it will be to stack these compared to block walls. I keep sitting here trying to think of how to price something so big. If I was to price this as a smaller wall I could get a better handle on it. I suppose I could break the wall down into pieces and try to get a overall "estimate" on time to do something this big. thanks for the help!

Variables to me seem to be-

Time to stack
Charge for boulders and hauling cost. Will be around 40 miles from supplier
__________________
www.wdsmlawncare.com
Reply With Quote
  #4  
Old 06-10-2013, 07:00 PM
Drakeslayer Drakeslayer is offline
LawnSite Member
 
Join Date: Apr 2013
Posts: 132
Are you going to be using a skid steer with forks? If so, it will be more difficult. I would say you should do 100 SF per day. Also it depends on how you plan on stacking the boulders. You could set them in rows(like a snowman) or more of an Ashler pattern. The snowman will go quicker if your boulders are relatively all the same size. Cost of boulders varies in different areas but is usually around $50-60 per ton. That includes delivery.
Reply With Quote
  #5  
Old 06-10-2013, 07:29 PM
Wiedmann's Avatar
Wiedmann Wiedmann is offline
LawnSite Member
 
Join Date: Apr 2011
Location: Prole, IA
Posts: 128
I plan on using a skid loader and doing a snowball like Design. Last time I checked boulders were going for $90 a ton here.
Posted via Mobile Device
Reply With Quote
  #6  
Old 06-10-2013, 09:55 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,764
A boulder wall should ONLY be done on a time a material basis.

It's a slow process. Moving and setting ONE boulder at a time. Been there done that
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #7  
Old 06-11-2013, 05:51 PM
Stillwater Stillwater is offline
LawnSite Platinum Member
 
Join Date: Mar 2006
Location: The United States
Posts: 4,250
Quote:
Originally Posted by DVS Hardscaper View Post
A boulder wall should ONLY be done on a time a material basis.

It's a slow process. Moving and setting ONE boulder at a time. Been there done that
Well said....1 rock can be 5 min or 45.... Or more
Posted via Mobile Device
Reply With Quote
  #8  
Old 06-11-2013, 08:04 PM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,405
We try to stay away from boulders for retaining walls, why not work with stone that has a flat bottom. Armourstone goes up quickly and when ordered by load can all be within one inch of each other. Boulders really don't do a great job of retaining imo.
Reply With Quote
  #9  
Old 06-11-2013, 08:09 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,764
this topic comes up multiple times a year.

if this were my forum, I would have a section titled: Topics asked over & over


and if you're importing boulders - I would NEVER commit to a quantity. I would tell the customer that it's $xxx.xx per truck load, theres xxx tons per truck, and the job may need xxx - xxxx tons. (notice my wording, I wrote "may", and that's INTENTIONAL)


.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
  #10  
Old 06-11-2013, 08:14 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,764
The use of boulders should be based on the setting of the property. Boulders would look out of place used in a planned unit development where all the houses look the same and all the house have brick fronts and siding on the sides and back.


All the veteran regulars have seen this pic a hundred times on this site. This setting is perfect for boulders. And the wall is still standing - nearly 10 yrs later. This job took us 26 days to complete with 3 guys (maybe it was 4) working on it. And no - a skid steer won't really work too well to set boulders like the ones in the picture, you need an excavator. This job was a time and materials job, and the boulders are native to the site and were already there.

__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.

Last edited by DVS Hardscaper; 06-11-2013 at 08:18 PM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:04 PM.

Page generated in 0.07498 seconds with 10 queries