Register free!


 
 
Thread Tools   Display Modes
Prev Previous Post   Next Post Next
  #13  
Old 06-16-2013, 10:17 AM
Smallaxe Smallaxe is offline
LawnSite Fanatic
 
Join Date: May 2007
Location: Central Wisconsin
Posts: 9,945
Quote:
Originally Posted by Rick13 View Post
My Plan of Attack for this Fall in My Bare Spot would be as followed:

1. Scratch up the surface ground area about 3 inches deep with a small rake (the type with 3 fingers)....just trying to loosen up the soil a bit.

2. Place Organic Compost in bare spot and mix current loosen soil with new organic compost together.

3. Then Hand spread seed over bare spot.

3. Rake seed and ground/organic compost soil together to buried seed into the ground.

4. Take a shovel of organic compost and spread over the bare spot area. Covering any leftover seed that might be exposed.

4. Then wet down the area....giving the bare spot a good soaking.

It sounds like a lot of work....but it would go really quick...and I don't mind doing a little more work for better results.
That is very similar to what I do except I use a "Garden Weasel" type tool to work up soil and mix in compost and seed,,, instead of 3 pronged claw...
For this time of year I'm shortening the process to presoaked seed in a compost slurry and applying that to barespots...

I agree with your premise that the work involved is well worth the results... Good luck...
__________________
*
Now that I know that clay's texture(platelets) has nothing to do with water infiltration, percolation, or drainage
,,, I wonder what does...
*
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:05 PM.

Page generated in 0.10775 seconds with 9 queries