Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
Reply
 
Thread Tools Display Modes
  #31  
Old 07-14-2013, 09:31 PM
Dually00-00's Avatar
Dually00-00 Dually00-00 is offline
LawnSite Member
 
Join Date: Mar 2013
Location: Bucks county Pa
Posts: 177
Most hauling companys in my area charge 100 hr or more weather its a small s/a or tri axle. My point was that it may take a guy all day in a small truck to haul that much that being said 800 for an 8 hr day and you have undamaged blacktop is money well spent . Not saying a tri axle would damage it but I belive it was a concern .
Reply With Quote
  #32  
Old 07-14-2013, 10:54 PM
GQLL GQLL is offline
LawnSite Senior Member
 
Join Date: Mar 2011
Location: Hampton Roads, Va
Posts: 720
I had a local guy haul 40 ton of stone for me he did it in 2 trips for 250. In my 450 I would have taken 10-11 trips 20 minutes each way plus time siting in the yard. I'd rather have somebody haul for me. Now if all I need is 8 ton or less then I haul it. But there your talking 25 tons your talking 7 loads if you run a 4 ton load in a 450/550 depending on distance from job I don't see how it would be cheaper and put more money in the bank. Also that is less wear and tear on my equipment. Which equates to less money
Reply With Quote
  #33  
Old 07-15-2013, 07:48 AM
gcbailey's Avatar
gcbailey gcbailey is online now
LawnSite Bronze Member
 
Join Date: Mar 2012
Location: southern WV
Posts: 1,716
I'll be talking with the business owner today, it is a woman, and I'll let her know about possible concerns relating to the blacktop. As I said, I have let her know that it can't be done in one load. The business is a very successful hair/spa/massage place. So she is wanting to replace yearly mulching with permanent rock.

The thing about it is, I'm looking at buying the rock straight from the source, which is about 50 miles away, 80% interstate travel, but I'm guessing that's going to be at least 2 hours per trip on a dump? Right? Not counting if there's a line waiting to get loaded... So paying hourly for hauling could get pretty pricy. The quarry offers a price break at 20 tons... anything below is $45/ton... anything above is $35/ton. Also anyone local that sells the rock, sells it for $48/skidsteer scoop, about 1/2 ton. So to me it's worth it getting it straight from the source, right?

Another thing too, above the sign is a steeper grade with a 4 lane US highway. She gets LOTS of runoff every time there is a good rain and it washes all the mulch away. I can't count the time we've spent there blowing and sweeping mulch back in place.

Last edited by gcbailey; 07-15-2013 at 07:53 AM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 12:07 AM.

Page generated in 0.06445 seconds with 10 queries