Register free!
Search
 
     

Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 07-28-2013, 09:56 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
i do 25-88g jobs all day long.

nothing different on a 890g job just 10x the payroll, supplies,

everything is math. production time planting a tree with just an excavator vs excavator + skid steer etc.

the project will be done in stages, i will find out about it this month.

I assure you i can execute any project from 25g up.

numbers. projections. actual cost. variance. evaluate, adjust.

just to prove your point wrong, my first job was 10k and I never looked back. i bill 6 figures in august.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 02:50 PM.

Page generated in 0.11774 seconds with 9 queries