  #11  
Old 07-28-2013, 09:56 PM
italianstallion69 italianstallion69 is offline
LawnSite Member
 
Join Date: Sep 2012
Posts: 108
i do 25-88g jobs all day long.

nothing different on a 890g job just 10x the payroll, supplies,

everything is math. production time planting a tree with just an excavator vs excavator + skid steer etc.

the project will be done in stages, i will find out about it this month.

I assure you i can execute any project from 25g up.

numbers. projections. actual cost. variance. evaluate, adjust.

just to prove your point wrong, my first job was 10k and I never looked back. i bill 6 figures in august.
Reply With Quote
  #12  
Old 08-01-2013, 08:58 PM
94gt331's Avatar
94gt331 94gt331 is offline
LawnSite Senior Member
 
Join Date: Jul 2011
Posts: 962
Good post! I do alot of small jobs. My highest job ever was $15,000 haha peanuts compared to you. But we stay really busy knocking out 500- 2,000 jobs reguarly. Good luck to you man. Your on a different level than I am and certainly need to have alot of confidence in your company. I honestly like to play it to safe all the time. I turn down any job that gets to complicated and risky. But to each his own, good luck send us some pics if you get it.
__________________
2006 Dodge 3500 dually cummins diesal
2004 Chevy 2500 HD dump insert
2003 Ford f350 lariet powerstorke Utility bed
1997 Ford F250
2010 John Deere 315 skidloader
44inch Toro Z-master
44inch Toro walk-behind
36inch Toro walk-behind
48inch Exmark Metro walk-behind
Stilh and husqavarna power equiptment
haulin 16 ft enclosed trailer for mowers
haulin 18 ft enclosed trailer for landscaping
Reply With Quote
  #13  
Old 08-01-2013, 10:09 PM
AintNoFun AintNoFun is online now
LawnSite Bronze Member
 
Join Date: Nov 2003
Location: Northeast
Posts: 1,729
whats your plan if the GC stiffs you? can you absorb the hit or go outta business?
Reply With Quote
  #14  
Old 08-01-2013, 10:26 PM
IES IES is offline
LawnSite Senior Member
 
Join Date: Mar 2011
Location: Central Indiana
Posts: 288
Quote:
Originally Posted by AintNoFun View Post
whats your plan if the GC stiffs you? can you absorb the hit or go outta business?
I've been there and ain't any fun. After that I've changed the way I run any size job. And the way I look at any large job as well.
Reply With Quote
  #15  
Old 08-02-2013, 01:32 AM
JimLewis's Avatar
JimLewis JimLewis is offline
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,281
Honestly, he has a better chance of putting himself out of business - just by not knowing his production times well enough and not considering all of the possible expenses. You take on a $400,000 job -- only to find out near the end that you should have bid $500,000 like everyone else -- that will put you out of business faster than anything.
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon
Reply With Quote
  #16  
Old 08-02-2013, 01:58 AM
SRT8's Avatar
SRT8 SRT8 is online now
LawnSite Senior Member
 
Join Date: Oct 2012
Location: CA
Posts: 705
Quote:
Originally Posted by JimLewis View Post
Honestly, he has a better chance of putting himself out of business - just by not knowing his production times well enough and not considering all of the possible expenses. You take on a $400,000 job -- only to find out near the end that you should have bid $500,000 like everyone else -- that will put you out of business faster than anything.
Yea, when bidding any job you have to know every single number.
If its a $500k job and you bid $400k just to land it...................you wont be around very long. We recently turned down a job for $1.3mil , we were at $1.6 and they wanted us to drop our price and match what the other company was charging.............wasn't going to happen. $300k is a lot of money.
When doing commercial you can lose a lot of money really fast, that's the bad part about it. You are forced to work around so many contractors, some times its ok and sometimes they are all ******ed.
Reply With Quote
  #17  
Old 08-03-2013, 10:33 PM
alexschultz1's Avatar
alexschultz1 alexschultz1 is offline
LawnSite Bronze Member
 
Join Date: Mar 2006
Location: north of atlanta
Posts: 1,140
Ok, let's say he bids the job for $300k and it ends up being 400k. What do you do? I'm with 94gt331, my most expensive job was $35k so this is very foreign to me.
__________________

Ive taken advantage of the world market and started a new business. We are building bombs in the shape of prayer blankets for our middle eastern customers. Business couldnt be better. The prophets are going through the roof!!
Reply With Quote
  #18  
Old 08-04-2013, 07:26 PM
JimLewis's Avatar
JimLewis JimLewis is offline
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,281
Quote:
Originally Posted by alexschultz1 View Post
Ok, let's say he bids the job for $300k and it ends up being 400k. What do you do?
You end up completing the job but instead of making the $55 per man hour you were hoping to make, you make $35 per man hour. The materials are a fixed price. So that cannot give. The only thing that gives is the amount of money you make after materials (labor, profit).

In that case, in reality, you'd end up paying your workers; paying for a lot of the materials; still owing suppliers for some of the materials; making no profit on the job; some big tax bills, insurance bills, and worker's comp. bills that you wouldn't be able to pay. Then you'd be scrambling to land another job to help you recover your loss on that previous job. As you started getting funds in from the new job, you'd start paying off your late bills that were stacking up. Hopefully, you'd learn your lesson and start learning how to bid jobs correctly. But often times if you cannot get back on track quickly enough, it just ends up putting you out of business, because you're not really accounting for your full overhead and can't pay the bills.

That's probably the most typical scenario.

Another scenario is you run out of funds and cannot complete the job. The client goes against your surety bond and the bond company covers the cost to have another contractor come in and complete the job (read more here). Then your bonding company retracts your bond, black lists you, and you cannot get a bond anymore. At least not without paying exorbitant rates. So without a bond you lose the ability to bid jobs like this again and go out of business.
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon

Last edited by JimLewis; 08-04-2013 at 07:31 PM.
Reply With Quote
  #19  
Old 08-04-2013, 09:09 PM
AintNoFun AintNoFun is online now
LawnSite Bronze Member
 
Join Date: Nov 2003
Location: Northeast
Posts: 1,729
Quote:
Originally Posted by JimLewis View Post
Another scenario is you run out of funds and cannot complete the job. The client goes against your surety bond and the bond company covers the cost to have another contractor come in and complete the job (read more here). Then your bonding company retracts your bond, black lists you, and you cannot get a bond anymore. At least not without paying exorbitant rates. So without a bond you lose the ability to bid jobs like this again and go out of business.
your forgetting another scenario (imo the most likely), he doesn't have the funds to finish and walks away. the gc hires someone else to finish the job and backcharges him the difference. gc sues him for the difference now he can owe another few hundred thousand on the job thus putting him outta biz..
Reply With Quote
  #20  
Old 08-04-2013, 09:34 PM
JimLewis's Avatar
JimLewis JimLewis is offline
LawnSite Fanatic
 
Join Date: Dec 1999
Location: Beaverton, OR
Posts: 6,281
Quote:
Originally Posted by AintNoFun View Post
your forgetting another scenario (imo the most likely), he doesn't have the funds to finish and walks away. the gc hires someone else to finish the job and backcharges him the difference. gc sues him for the difference now he can owe another few hundred thousand on the job thus putting him outta biz..
Not very likely. Any G.C. doing a job this size is going to require a surety bond. You wouldn't hire someone for a job that big without that contractor being bonded. Hence my second scenario above.
__________________
Jim Lewis
Lewis Landscape Services - Oregon
"kickin' grass and takin' names"


www.lewislandscape.com - Portland Oregon Landscaping Company

landscape design Portland Oregon
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 11:12 AM.

Page generated in 0.08492 seconds with 10 queries