Gunite Pool Demo

I am demoing this pool that has too be the most well built pool in my life. This thing has rebar in a grid on 1 foot centers through the whole pool with walls 5 plus inches thick.Anyone else had a pool like this?
Reply With Quote
  #2  
Old 08-26-2013, 07:01 PM
whiffyspark whiffyspark is online now
LawnSite Platinum Member
 
Join Date: Jul 2011
Location: Chesapeake beach
Posts: 4,741
Yeah almost sunk my business in one
Reply With Quote
  #3  
Old 08-26-2013, 07:09 PM
KrayzKajun's Avatar
KrayzKajun KrayzKajun is online now
LawnSite Fanatic
 
Join Date: Oct 2006
Location: Harvey,LA
Posts: 10,182
Wow. Any pics?
Reply With Quote
  #4  
Old 08-26-2013, 07:38 PM
bobcat_ron's Avatar
bobcat_ron bobcat_ron is offline
LawnSite Fanatic
 
Join Date: Nov 2007
Location: Abbotsford, British Columbia
Posts: 9,913
Just yank the walls in with a 20 ton hoe, gunnite concrete is weak as plaster once the rebar starts to bend, I did one years ago and it was only a 2 hour job.
__________________
“The only difference between a pigeon and a farmer today
is that a pigeon can still make a deposit on a John Deere.” - Harry De Jong



http://www.youtube.com/user/69rd96
Reply With Quote
  #5  
Old 08-26-2013, 08:35 PM
ksss's Avatar
ksss ksss is offline
LawnSite Fanatic
 
Join Date: Jan 2003
Location: Rigby, Idaho
Posts: 6,857
Yea the Gunnite isn't that hard to hammer. I doubt you have room for a 210 sized excavator, although if you do great. Assuming your don't, I would put a hammer on your Kubota and have a guy with a demo saw cutting rebar. Hammer out a grid, cut and pull. The smaller the bucket on the hoe the better as you already know for pulling concrete.
__________________
See us at www.kaiserskidsteer.com

Proudly running CASE and Takeuchi equipment.
Reply With Quote
  #6  
Old 08-26-2013, 09:50 PM
Junior M's Avatar
Junior M Junior M is offline
LawnSite Fanatic
 
Join Date: Jun 2008
Location: South Carolina
Posts: 13,102
Sounds about normal for a pool around this area.. I prefer closer 6-8in thick in the floor and 8 plus inches in the walls. But you always miss a little with shaving and so on.

We always shoot for 12in squares in the rebar.. And we'll put some at an angle all the way across the pool depending on the curves and nature of the build..
Reply With Quote
  #7  
Old 08-26-2013, 10:54 PM
1idejim's Avatar
1idejim 1idejim is online now
LawnSite Fanatic
 
Join Date: Jul 2009
Location: State of Jefferson
Posts: 6,833
Quote:
Originally Posted by AWJ Services View Post
I am demoing this pool that has too be the most well built pool in my life. This thing has rebar in a grid on 1 foot centers through the whole pool with walls 5 plus inches thick.Anyone else had a pool like this?
Steel schedules vary by region but normally the #3 steel mat is 12x12. Alternates begin at the springline -3 feet to make the grid 6x12. Floor bars also run across the break. The bond beam has 3 horizontal bars. 2 on top and one underneath the stirrup radius. Another horizontal 6 in down completes the shell reinforcement with the exception of skimmers, lights and swim-outs.

Gunite is a 7 sack mix design and when applied properly has breaking strengths well above 3750 psi. We have shot test cylinders on state jobs that broke at over 5000 psi.

Shot-crete on the other hand is a wet mix design which may be what the other guys are talking about.

I worked in and around the pool business from mid 60s until 09. Dug, tied, plumbed, shot a lot of holes.

Swimming pools get their strength from their inverted dome construction.
Reply With Quote
  #8  
Old 08-27-2013, 06:59 AM
AWJ Services AWJ Services is online now
LawnSite Platinum Member
 
Join Date: Jun 2004
Location: Ga
Posts: 4,143
Quote:
Originally Posted by 1idejim View Post
Steel schedules vary by region but normally the #3 steel mat is 12x12. Alternates begin at the springline -3 feet to make the grid 6x12. Floor bars also run across the break. The bond beam has 3 horizontal bars. 2 on top and one underneath the stirrup radius. Another horizontal 6 in down completes the shell reinforcement with the exception of skimmers, lights and swim-outs.

Gunite is a 7 sack mix design and when applied properly has breaking strengths well above 3750 psi. We have shot test cylinders on state jobs that broke at over 5000 psi.

Shot-crete on the other hand is a wet mix design which may be what the other guys are talking about.

I worked in and around the pool business from mid 60s until 09. Dug, tied, plumbed, shot a lot of holes.

Swimming pools get their strength from their inverted dome construction.
The pool structure is why harder than the deck.
Reply With Quote
  #9  
Old 08-27-2013, 07:00 AM
AWJ Services AWJ Services is online now
LawnSite Platinum Member
 
Join Date: Jun 2004
Location: Ga
Posts: 4,143
Quote:
Originally Posted by KrayzKajun View Post
Wow. Any pics?
Yes I will post them when I am done.
Reply With Quote
  #10  
Old 08-27-2013, 11:26 AM
YellowDogSVC's Avatar
YellowDogSVC YellowDogSVC is online now
LawnSite Gold Member
 
Join Date: Oct 2006
Location: TX
Posts: 3,472
I think this will be a good learning opportunity of what works and doesn't work. I look forward to the pictures and finding out how the job goes for you. What sized machine did you decide on?
__________________

"Life is tough, but it's tougher if you're stupid."

Twitter @Cedar_Clearing
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 03:38 AM.

Page generated in 0.07751 seconds with 9 queries