Register free!
Search
 
     

Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 12-06-2013, 11:25 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is online now
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,762
Quote:
Originally Posted by GreenI.A. View Post
We have been doing a 4 day work week aswell. For me it was simple math. Before the guys were working five days. It takes an hour in the morning to get out the gate and make it to our job sites. Then figure a hour drive back to the shop in the afternoon, and a half hour to unload and load up for the next day. With an 8 hr day we were only on the job sites for 5.5hrs, that's only 27.5hrs a week. Now we do four 10hr days, with the same time constraints we get 7.5 hours of production a day, which is 30hrs a week.

Working Monday-Thursday is great. We do a lot of 2day irrigation and lighting installs. So we usual schedule one to start Monday then a second for Wednesday. Same with small softscapes. On large construction jobs During the summer we find that a lot of our customers and their neighbors work a 4day week or work from home on Fridays, so they enjoy not listening to our equipment and saws as well.

Another huge benefit is when we need guys to work overtime. Guys are a lot more likely to volenteer to work ot on a Friday than they are on a Saturday. Guys are also less likely to call out for appointments since they have a weekday off to do them. They don't have to take a morning off to go to the dentist or to the DMV, one guy is about to have a baby, his wife schedule all the dr appointments for Fridays. It's definitely been a huge win-win
It's amazing what you can see when you sit down and break the numbers down. And even if we exceed 40 hrs and pay overtime in 4 days - we're still saving money.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 04:18 PM.

Page generated in 0.85476 seconds with 9 queries