Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 01-06-2014, 11:10 PM
Luke S.'s Avatar
Luke S. Luke S. is offline
LawnSite Member
 
Join Date: Sep 2013
Location: St.paul, Minnesota
Posts: 41
Quote:
Originally Posted by Roof Cleaning Virginia View Post
With all due respect Mr. Stead, that's incorrect. I'm not sure how that rumor has become so wide spread, as many seem to think that 40f is the cut off. It's not. SH simply works slower at low temps, and at some point the cold is too hard on equipment and hoses to be productive. (We've literally treated roofs that had heavy frost on them, of course it melted off on contact)

So to the OPs question the answer is no, it's MUCH slower; but it can be done. With that said, go a little stronger with your SH mixture and be very patient.
Thanks. I hadn't heard that.
__________________
Luke Stead
Lions Share Maintenance
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 07:17 PM.

Page generated in 0.09698 seconds with 9 queries