Register free!


Reply
 
Thread Tools   Display Modes
  #1  
Old 06-12-2014, 11:07 PM
Turf Z Turf Z is offline
LawnSite Member
 
Join Date: Oct 2009
Location: Midwest
Posts: 73
Complete Teardown?

Thoughts on repairing something like this? :

http://i.imgur.com/EiFNvee.jpg
http://i.imgur.com/IfMejJC.jpg
http://i.imgur.com/DGqc5eo.jpg
Reply With Quote
  #2  
Old 06-12-2014, 11:53 PM
alldayrj's Avatar
alldayrj alldayrj is offline
LawnSite Gold Member
 
Join Date: Apr 2012
Location: Long island, NY
Posts: 3,182
I wouldnt be standing that close
__________________
RJ All Day
Masonry and Landscapes
www.rjfalcone.com
Reply With Quote
  #3  
Old 06-13-2014, 05:18 PM
Turf Z Turf Z is offline
LawnSite Member
 
Join Date: Oct 2009
Location: Midwest
Posts: 73
Quote:
Originally Posted by alldayrj View Post
I wouldnt be standing that close
That bad eh
Posted via Mobile Device
Reply With Quote
  #4  
Old 06-13-2014, 10:59 PM
E-mans Hardscapes E-mans Hardscapes is online now
LawnSite Member
 
Join Date: Mar 2014
Location: Oshkosh Wi
Posts: 122
Wow! That's one heck of a project. The block seems small for that application.
Posted via Mobile Device
Reply With Quote
  #5  
Old 06-14-2014, 03:59 AM
TPendagast's Avatar
TPendagast TPendagast is online now
LawnSite Gold Member
 
Join Date: May 2008
Location: Wasilla, AK
Posts: 3,989
the block is fine,

its a pre engineered wall system that was installed improperly.

Ill venture to guess there is no drain behind the wall and it looks to me like hydraulic push and washout of base material.

Im also guessing you will find no geo-grid when doing the tear down.
That's bad.

I find that when doing these tear downs and reinstalling, that the cost of the redo comes out to around 2.8 times the cost if there was no wall/landscaping at all and you were putting in new (and yes that includes reusing most of the block already present)

So I generally use the 2.8 factor as a guide line , which prompts me to say, hey have I forgotten something on this bid? Im below 2.8 installed new……

Generally 2.8, like I said is the average.

I can't see the whole wall or know all the face feet, but before you waste a lot of time, find out what the customer is willing to have as a budget for this.

if it's not tens of thousands of dollars, then no need to waste time crunching numbers, because it WILL be north of 20 grand.
Reply With Quote
  #6  
Old 06-14-2014, 06:52 PM
Red Shed Landscaping Red Shed Landscaping is offline
LawnSite Member
 
Join Date: Mar 2007
Location: North Central IA
Posts: 175
We rebuilt the walls in the pictures for a walk out basement. They were built on sand and didn't have gutters on the house making it fail. It took us around 300 hours to take them all apart and rebuild them with a gravel base and geogrid. We only put new caps on since many were crumbling. It was around $16,000 to rebuild it for these relatively small walls compared to the ones you are looking at rebuilding.
Attached Images
   
Reply With Quote
  #7  
Old 06-14-2014, 09:10 PM
E-mans Hardscapes E-mans Hardscapes is online now
LawnSite Member
 
Join Date: Mar 2014
Location: Oshkosh Wi
Posts: 122
300 hrs is 18k in labor alone. Plus caps, gravel, and grid.
Posted via Mobile Device

Last edited by E-mans Hardscapes; 06-14-2014 at 09:14 PM.
Reply With Quote
  #8  
Old 06-14-2014, 09:23 PM
Red Shed Landscaping Red Shed Landscaping is offline
LawnSite Member
 
Join Date: Mar 2007
Location: North Central IA
Posts: 175
Quote:
Originally Posted by E-mans Hardscapes View Post
300 hrs is 18k in labor alone. Plus gravel and grid.
Posted via Mobile Device
Our hourly rate is $45 so that is how it was $16000 with materials. I gave the hours rather than just a dollar amount so you could plug whatever hourly rate in there. It would be nice if our area could support a $60/hr rate.
Reply With Quote
  #9  
Old 06-16-2014, 04:08 AM
TPendagast's Avatar
TPendagast TPendagast is online now
LawnSite Gold Member
 
Join Date: May 2008
Location: Wasilla, AK
Posts: 3,989
I think when you look at something like this, and tell people "IT will be more than 20 grand" it saves you the time of bothering to do an estimate… because in their wee little minds they are hoping it's going to be like 5k.

something like in the first plc which is probably 1200 face feet (maybe more)
you could be looking at a summer long project.

Most people aren't going to buy into that, they are hoping you can stick your thumb in the dike.
Reply With Quote
  #10  
Old 06-16-2014, 09:34 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,896
It costs more to rebuild than to start from scratch.

Always best to be transparent at the time of initial inspection and tell the owner everything up front. Meaning approx costs. This way you don't waste any more time
Posted via Mobile Device
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump






Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.com™ - Moose River Media
All times are GMT -4. The time now is 09:02 AM.

Page generated in 0.11494 seconds with 10 queries