Register free!
Search
 
     

The Green Industry's Resource Center


Click for Weather
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 12-02-2003, 10:38 AM
rooty rooty is offline
LawnSite Member
 
Join Date: Sep 2003
Location: Denver, CO zones 3-5
Posts: 1
Add Ons and Change orders

I have been in the landscape business 6 years now and still find it difficult to inform clients they will be billed or charged for changes to their landscape above and beyond the contract. I have a clause in my contract about change orders, but sometimes find it hard to fill out a change order when we are installing and they come out and make changes. This means I have to stop work, fill out the paper work, figure out cost, go over it with them, wait for there decision and then move on. In most cases I just make the changes and find myself getting into trouble when it comes time for final payment. Does anybody else have this problem...and if so, how do you handle it?
For example: I had a recent client who we installed outdoor low voltage lighting for. He wanted to controller out in the yard v.s. next to the outlet on the deck. So we hard wired an outlet out into his yard off his fuse panel. When I tried billing him for the labor and materials for the outlet, he thought it should be included with the lighting per the original contract. Which of course was not specific enough to state where the controller whould be plugged in.
Thanks
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 08:14 PM.

Page generated in 0.07625 seconds with 8 queries