Register free!

The Green Industry's Resource Center



 
 
Thread Tools   Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 02-27-2004, 08:08 PM
jrussell555 jrussell555 is offline
LawnSite Member
 
Join Date: Jan 2004
Location: Salt Lake City, Utah
Posts: 14
Bid Question

Wanted to Know if this bid sounds close to accurate.

7500 Sq Ft. 4" Top soil to be added to rough grade lot. $1800
6900 Sq Ft. Sod to be put in $1850
600 Sq Ft. Mulch to be put in $70
Skid steer 3.5 days Total: $700
Power Rake 1 day: $200
Trencher 1 day: $200
Sprinkler System Installed: $1350

Total of: $6150.00

Does this number sound good for materials and equipment?

My Partner and I will be working on this for an estimated 5 days. Any opinions for labor rates?

Thanks

jrussell
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump





Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ©1998 - 2012, LawnSite.comô - Moose River Media
All times are GMT -4. The time now is 06:19 PM.

Page generated in 0.07769 seconds with 8 queries